|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2014-02291
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2014
>
DCPCUP-2014-02291
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2015 9:39:05 AM
Creation date
10/26/2015 4:00:18 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02291
Town
Medina Township
Section Numbers
14
AccelaLink
DCPCUP-2014-02291
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
°" Dane County Zoning Division <br /> 1 City-County Building <br /> � 210 Martin Luther King,Jr.,Blvd., Room 116 <br /> 0 " Madison Wisconsin 53703 <br /> 1C1 ;:" (608) 266-4266/266-9083 Fax (608) 267-1540 <br /> DANE COUNTY <br /> CONDITIONAL USE PERMIT #2291 <br /> THE ZONING AND LAND REGULATION COMMITTEE OF THE DANE COUNTY <br /> BOARD PURSUANT TO SECTION 10.255(2) OF THE DANE COUNTY CODE OF <br /> ORDINANCES DOES HEREBY: <br /> GRANT Conditional Use Permit#2291 for Petroleum Pumping Station pursuant to Dane <br /> County Code of Ordinances Section 10.123(3)(c) and subject to any conditions <br /> contained herein. <br /> EFFECTIVE DATE OF PERMIT: April 21, 2015 <br /> THE CONDITIONAL USE SHALL BE LOCATED ON THE PROPERTY DESCRIBED AS <br /> FOLLOWS: 5635 Cherry Lane, Section 14, Town of Medina, Dane County, <br /> Wisconsin (tax parcel ID: 0812-144-8002-0) <br /> CONDITIONS: <br /> 1. The pumping station shall be located and constructed as depicted in the presented <br /> plans. <br /> 2. Enbridge shall be responsible for obtaining a road use agreement with the Town of <br /> Medina prior to the construction of the pumping station to ensure repairs for any <br /> damage to local roadways. <br /> 3. A spill containment basin shall be constructed around the pumping station to handle <br /> a minimum of a 60 minute flow prior to the operation of the pumping station. <br /> 4. The pumping station shall be designed and constructed to limit the operating noise <br /> to a maximum of 50 decibels dba as measured at property lines. <br /> 5. Exterior lighting shall be down-shrouded to limit light pollution onto adjoining <br /> property. <br /> 6. Enbridge shall agree to indemnify and hold harmless Dane County for pollution <br /> losses Per the terms as detailed in Enbridge's proposal titled "CONDITIONAL USE <br /> PERMIT ("CUP") CONDITIONS", submitted and entered into the public record on <br /> January 27, 2015, which is incorporated herein by reference. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.