|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01522
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01522
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2015 3:29:22 PM
Creation date
10/28/2015 3:28:22 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01522
Town
Cottage Grove Township
Section Numbers
7
AccelaLink
DCPCUP-0000-01522
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.„' <br /> DANE COUNTY <br /> s'O.,,— ,1 r-1 r* e:1i, LAND CONSERVATION DEPARTMENT• <br /> Fa , : FEN OAK RESOURCE CENTER <br /> �\� ri-`lt' 1 Fen Oak Ct.,Rm. 208,Madison,Wisconsin 53718-8812 <br /> y'1rr'sCQiiss " PH: 608/224-3730•FAX: 608/224-3745 <br /> ''' ' -FL'.. .___L----2. .I <br /> DAM,: October 19, 1998 <br /> OCT 2 0 T <br /> TO: Jim Gre onus/Kris Schulte <br /> Dane County Zoning D.C.PLANNING t NT <br /> FROM: Kevin Connors K,2,, -, - ____ _� <br /> County Conservationist <br /> RE: OCTOBER ZONING PETITIONS AND CUPs <br /> 12. 7370 -John, Dennis & Vernon Halverson <br /> No issues noted on this site at this time. <br /> 13. 7371/CUP 1522 - Highland Management Corp. <br /> Soil erosion control issues and recommendations: <br /> 1) Divert surface water around disturbed area during construction phase. <br /> 2) Schedule grading and construction to minimize soil exposure. <br /> 3) Vegetate and mulch disturbed areas as soon as practical tt} '4 , Y. <br /> 4) Minimize runoff velocities prior to entering drainageways. ,,Y, _ `, <br /> 5) Construct and establish drainageways and outlets to handle the concentrated <br /> and/or increased flow. <br /> Compatibility with priori watershedplan for area: <br /> Area currently not located in priority watershed. <br /> Farm productivity of lands identified for development: <br /> Area mapped as VwA,KeB,PnB,ScB,and KdC2 capability classification 2e and 3e. <br /> Area is gently sloping with an increase in slope in the northwest corner south of the <br /> wood lot. <br /> Corn yield: VwA 130 bu./ac.- KeB 105 bu./ac.- PnB 130 bu/ac.- ScB 125 bu/ac. <br /> KdC2 85 bu/ac. <br />
The URL can be used to link to this page
Your browser does not support the video tag.