|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00886
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00886
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2015 10:35:44 AM
Creation date
11/2/2015 10:55:33 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00886
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "DO I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 10-19-15 <br /> Caller/Contact: Brian Droessler Phone#: 608-212-5340 <br /> Landowner: same Phone#: <br /> Contact Email: droessleramhtc.net <br /> Project Address: 2694 Cty Hwy F Blue Mounds, WI 53517 <br /> Location: Township: Blue Mounds Sec: 18 / NE <br /> Parcel#: 0606-181-8001-1 <br /> Project Description: Construction of an accessory building, 3320 sq. ft.. <br /> Planned Size of Disturbance: < 4000 ft2 Planned Size of New Impervious: 3320 ft2 <br /> Water Resource Engineering Division Response : <br /> Based on information above the project: ❑DOES* 0 DOES NOT require a permit <br /> Determination Made By: 0 RLS ❑JDB ❑JAS ❑JAH ❑JRT ❑AJM ❑JRR <br /> *Type of permit required: ❑EC ❑SM ❑SE <br /> ❑Disturbance >4000 ft2 ❑ Excavate/Fill>400 yds3 ❑ Disturbing 100' of ditch/channel <br /> ❑ 125'Long new access road/driveway ❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> ❑Shoreland Zone Disturbance ❑ Other: <br /> Basis for Determination: Project area is outside the shoreland zone and does not <br /> trigger the erosion control requirements of DCCO Ch. 14 or Ch 11 <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size,scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.