|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01503
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01503
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2015 3:47:47 PM
Creation date
11/6/2015 1:51:07 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01503
Town
Oregon Township
Section Numbers
17
AccelaLink
DCPCUP-0000-01503
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_aop, <br /> 11 <br /> i �; 11 <br /> °> t ''0; Dane County Planning P& Development <br /> 'a,� .„ ,i 4� ' Room 116, City-County Building, Madison, Wisconsin 53709 Land Division Review <br /> 4 . i ob <br /> 1'1,,�\cos* 608/266-9086 <br /> Property Listing <br /> 608/266-4120 <br /> Surveyor <br /> 608/266-4252 <br /> TO: ZNR Committee Zoning <br /> 608/266-4266 <br /> FROM: Mark Roffers, Senior Planner <br /> DATE: June 23, 1998 <br /> SUBJECT: CUP 1503, Burcalow, Hot-mix Asphalt Plant,Town of Oregon <br /> Planning Division staff prepared comments and suggested conditions of approval for the above <br /> listed CUP request. The agent/operator(Payne & Dolan) contacted staff to suggest a change to <br /> recommended condition#7. <br /> That condition suggested that the applicant repair CTHs A and D to the satisfaction of the <br /> Highway Commissioner if repairs become necessary as a result of hauling. Payne and Dolan's <br /> contract with DOT for the STH 69 and 92 projects requires that they repair all haul roads "to a <br /> condition equivalent to that which would have prevailed had such hauling not occurred." Staff <br /> has a copy of that contract on file. <br /> In light of this contract,the following change to proposed condition 7 is acceptable to both <br /> Planning staff and Payne and Dolan. <br /> 7. The primary haul route for trucks leaving the operation shall be Storytown Road to CTH D, <br /> CTH D to CTH A, and CTH A to the STH 69 and STH 92 job sites. If <br /> - -•-•• - . repairs to CTH D and CTH A are necessary as a result of <br /> hauling from the hot-mix plant site, as determined under provisions of the operator's contract <br /> with WisDOT,the operator shall repair such highways : . " . - •- . <br /> Geffiniissiefief per WisDOT Standard Specifications for Highway and Structure Construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.