|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-07259
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-07259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 2:46:47 PM
Creation date
11/6/2015 2:46:39 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
07259
Town
Roxbury Township
Section Numbers
6
AccelaLink
DCPREZ-0000-07259
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMPOSITE REPORT - Page 2 APPLICATION NO. <br /> STAFF COMMENTS <br /> ZONING REVIEW <br /> Petition 7259 Robert Wollersheim,Roxbury 6-A-1EX to C-1 <br /> Provide zoning compliance for a wine warehouse building for the Wollersheim Winery. The storage <br /> building was intended to be used only for AG purposes and constructed entirely in the A-1EX zoned area, <br /> but in fact was built partly in the existing 1.6+-acre C-1 zoned area. Bringing the building into <br /> compliance will allow any necessary C-1 uses in the building. No changes are proposed for the winery <br /> operation. <br /> REGIONAL PLANNING <br /> Petition 7259. This new building is part of an established winery in the Town of Roxbury. The plan <br /> map indicates that this is a Rural Non-farm District where such uses are allowed and the following <br /> policy applies: <br /> "Only such commercial and industrial development as is needed to support existing <br /> agricultural activities, where it will not result in environmental degradation or conflict with <br /> farming operations will be allowed. <br /> This site and additional building appear reasonably consistent with the adopted town/county policy. <br /> There needs to be a site plan drawn to scale which shows all buildings(existing and proposed),parking <br /> areas and roadways. An agreed upon site plan should give the applicant,town and county officials a <br /> clear understanding of the current status and any proposed expansion. <br /> ENVIRONMENTAL HEALTH (septic, etc.) <br /> DANE COUNTY HIGHWAY <br /> OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.