Laserfiche WebLink
COMPOSITE REPORT -Page 14 Application No. CUP 1484 <br /> the site and the entire Sugar River Basin, and the agricultural productivity of the site are <br /> much more difficult to address. The Town has recommended denial of this CUP. <br /> C. At the Committee's request, staff will prepare appropriate conditions if the Committee <br /> wishes to approve this request or prepare findings if the Committee wishes to deny the <br /> request. These could be available at the next work meeting. Note that the operator has <br /> submitted proposed conditions on the attached 5/14/98 letter. Staff met with the <br /> operator to discuss these proposed conditions. They are quite complete, but may benefit <br /> from some minor modifications and consolidation. <br />