Laserfiche WebLink
COMPOSITE REPORT -Page 3 Application No. CUP 1498 <br /> the mineral extraction site can b- used for this proposal; however, if the operation <br /> affects the ability to implement he plan as approved, revisions may be necessary. <br /> E. On May 4, 1998,the Cottage G love Town Board recommended approval of the request <br /> suggesting a condition that hou . of operation be limited to 6:00 a.m. to 6:00 p.m., <br /> Monday through Friday, and 7 ..m. to 5 p.m. Saturdays, if necessary. <br /> III. SUMMARY <br /> A. The proposed batch plant opera ion will be limited in duration, contained within a <br /> previously approved mineral ex action site, and adjacent to an intensive highway <br /> project. The main issues surrou ding this proposed CUP relate to its potential dust and <br /> noise impacts. Appropriate con s itions, consistent with those previously required for the <br /> mineral extraction site, should b- included to address these impacts. <br /> B. The applicant requests approval of the operation at the public hearing, due to the <br /> immediate need for the operatio . If the ZNR Committee approves this request, it may <br /> wish to consider the following c.nditions: <br /> 1. Operations shall cease no 1.ter than November 30, 1998, except that if the USH 12- <br /> 18 reconstruction project is not complete at that time, operations shall cease no later <br /> than June 30, 1999. <br /> 2. The operator shall develop :nd operate the site according to submitted site and <br /> operations plans. <br /> 3. Hours of operation shall be from 7:00 a.m. to 6:00 p.m. Monday through Friday, <br /> and 8:00 a.m. to 3:00 p.m. n Saturdays. No operations of any kind shall take place <br /> on Sundays and legal holid.ys. Hours may be extended temporarily if approved by <br /> the town board, with writte I notification being given to County Zoning. <br /> 4. There shall be no bulk fuel .tored on site. <br /> 5. Trucks shall exit the site di ectly to the USH 12-18 reconstruction project rather <br /> than to CTH N whenever p u ssible and subject to any required WisDOT approvals. <br /> Direct access to USH 12-1 : shall be prohibited when reconstruction is not <br /> occurring in the portion of e highway project adjacent to the CUP area. <br /> 6. The operator shall require t at all trucks have muffler systems which meet or <br /> exceed the then current st. dards for noise abatement, and shall require that all <br /> equipment required for con,rete batching meet or exceed the then current industry <br /> standards and state or feder:1 laws for noise abatement. <br /> 7. The operator shall spray the site with water if and when needed to control dust. <br /> The batch plant shall utiliz: dust control filters as approved by WDNR. <br /> 8. If the Highway Commissio er determines that improvements to the intersection of <br /> the access road and CTH N are necessary as a result of the batch plant operation, <br /> the operator shall improve •uch intersection at its expense to the specifications of <br /> the Highway Commissione . <br />