Katharine Lund
<br /> Environmental Scientist
<br /> •
<br /> Alliant Energy/WPL,Friesland Gas Main Extension, Threatened and Endangered Species Assessment,
<br /> Columbia County,Wisconsin Domtar-Port Edwards Mill Transmission Line,Wood
<br /> Led wetland and waterway determination and delineation County,Wisconsin
<br /> survey and GPS-based survey of environmental features along In coordination with the Wisconsin Department of Natural
<br /> a three mile stretch of county road through the Village of Resources(WDNR),assessed the potential for threatened and
<br /> Friesland. Led the data collection and survey of the wetland endangered species to be present and assessed the potential of
<br /> boundaries and waterways present within the project area project related impacts for a proposed 1,800 foot transmission
<br /> and prepared the final report. line and substation to connect to existing paper mill. Prepared
<br /> final report,submitted to WDNR,and received WDNR
<br /> Wetland and Waterway Investigation,AllEnergy, approval.
<br /> Trempealeau County, Wisconsin
<br /> Conducted wetland delineation survey for proposed frac sand Threatened and Endangered Species Assessment,
<br /> mine railroad spur and associated facilities and utilized GPS ATC Paris to Albers 138kV Rebuild Project, Kenosha
<br /> to map identified features.Also conducted visual assessment County,Wisconsin
<br /> of wetlands and waterways within proposed mine footprint to In coordination with the Wisconsin Department of Natural
<br /> identify potential resources under USACE jurisdiction. Resources(WDNR),assessed the potential for threatened and
<br /> Assisted with preparation offinal report. endangered species to be present and assessed the potential of
<br /> project related impacts from re-build construction activities
<br /> Wetland Investigation,John's Disposal,Jefferson along 12 miles of existing transmission line. Created
<br /> County, Wisconsin assessment tables,prepared final report,submitted to WDNR,
<br /> Conducted wetland delineation within agricultural lands for and received WDNR approval.
<br /> proposed expansion of waste disposal facilities. This
<br /> investigation included Farm Service Agency aerial slide Telecommunications Compliance Assessments*,
<br /> review and GPS-based survey of environmental features. Various locations across Wisconsin,Minnesota,and
<br /> Prepared the final report.
<br /> Michigan
<br /> Facilitated NEPA/Section 1o6 compliance for over 500
<br /> Threatened and Endangered Species Assessment, telecommunications projects,including a large scale 4G LTE
<br /> West Central Lateral Project,Clark,Eau Claire, antenna upgrade for the primary client.Performed wetland
<br /> Jackson,and Monroe Counties,Wisconsin delineations and determinations with accompanying reports,
<br /> In coordination with the Wisconsin Department of Natural utilizing the Corps of Engineers Midwest and
<br /> Resources(WDNR),assisted with the assessment of the Northeast/Northcentral Regional supplements.Coordinated
<br /> potential for threatened and endangered species to be present investigations and completed reliable reports for
<br /> and assessed the potential of project related impacts for two NEPA/Section 106 compliance submittals,based on
<br /> proposed project corridors covering over loo miles.Created consultation with various state historic preservation offices,
<br /> assessment tables and prepared portions offinal report for Native tribes,US Fish and Wildlife Service,state natural
<br /> submittal to WDNR. resource departments,and local governments and
<br /> newspapers for a variety of clients.
<br /> Threatened and Endangered Species Assessment,
<br /> MG&E Gas Main Extension,Columbia County, US Hwy 151 Wetland Investigation,Columbia,
<br /> Wisconsin Dane,and Dodge Counties,Wisconsin
<br /> In coordination with the Wisconsin Department of Natural Led wetland determination and delineation survey and GPS-
<br /> Resources(WDNR),assessed the potential for threatened and based survey of environmental features within a 3o mile
<br /> endangered species to be present and assessed the potential of stretch of US Hwy 151 at eight locations requiring guardrail
<br /> project related impacts for a proposed 3 mile gas main repair and maintenance. Reviewed field collected data and
<br /> extension.Prepared final report,submitted to WDNR,and prepared final report.
<br /> received WDNR approval.
<br /> *denotes projects completed with other firms
<br />
|