Laserfiche WebLink
Katharine Lund <br /> Environmental Scientist <br /> • <br /> Alliant Energy/WPL,Friesland Gas Main Extension, Threatened and Endangered Species Assessment, <br /> Columbia County,Wisconsin Domtar-Port Edwards Mill Transmission Line,Wood <br /> Led wetland and waterway determination and delineation County,Wisconsin <br /> survey and GPS-based survey of environmental features along In coordination with the Wisconsin Department of Natural <br /> a three mile stretch of county road through the Village of Resources(WDNR),assessed the potential for threatened and <br /> Friesland. Led the data collection and survey of the wetland endangered species to be present and assessed the potential of <br /> boundaries and waterways present within the project area project related impacts for a proposed 1,800 foot transmission <br /> and prepared the final report. line and substation to connect to existing paper mill. Prepared <br /> final report,submitted to WDNR,and received WDNR <br /> Wetland and Waterway Investigation,AllEnergy, approval. <br /> Trempealeau County, Wisconsin <br /> Conducted wetland delineation survey for proposed frac sand Threatened and Endangered Species Assessment, <br /> mine railroad spur and associated facilities and utilized GPS ATC Paris to Albers 138kV Rebuild Project, Kenosha <br /> to map identified features.Also conducted visual assessment County,Wisconsin <br /> of wetlands and waterways within proposed mine footprint to In coordination with the Wisconsin Department of Natural <br /> identify potential resources under USACE jurisdiction. Resources(WDNR),assessed the potential for threatened and <br /> Assisted with preparation offinal report. endangered species to be present and assessed the potential of <br /> project related impacts from re-build construction activities <br /> Wetland Investigation,John's Disposal,Jefferson along 12 miles of existing transmission line. Created <br /> County, Wisconsin assessment tables,prepared final report,submitted to WDNR, <br /> Conducted wetland delineation within agricultural lands for and received WDNR approval. <br /> proposed expansion of waste disposal facilities. This <br /> investigation included Farm Service Agency aerial slide Telecommunications Compliance Assessments*, <br /> review and GPS-based survey of environmental features. Various locations across Wisconsin,Minnesota,and <br /> Prepared the final report. <br /> Michigan <br /> Facilitated NEPA/Section 1o6 compliance for over 500 <br /> Threatened and Endangered Species Assessment, telecommunications projects,including a large scale 4G LTE <br /> West Central Lateral Project,Clark,Eau Claire, antenna upgrade for the primary client.Performed wetland <br /> Jackson,and Monroe Counties,Wisconsin delineations and determinations with accompanying reports, <br /> In coordination with the Wisconsin Department of Natural utilizing the Corps of Engineers Midwest and <br /> Resources(WDNR),assisted with the assessment of the Northeast/Northcentral Regional supplements.Coordinated <br /> potential for threatened and endangered species to be present investigations and completed reliable reports for <br /> and assessed the potential of project related impacts for two NEPA/Section 106 compliance submittals,based on <br /> proposed project corridors covering over loo miles.Created consultation with various state historic preservation offices, <br /> assessment tables and prepared portions offinal report for Native tribes,US Fish and Wildlife Service,state natural <br /> submittal to WDNR. resource departments,and local governments and <br /> newspapers for a variety of clients. <br /> Threatened and Endangered Species Assessment, <br /> MG&E Gas Main Extension,Columbia County, US Hwy 151 Wetland Investigation,Columbia, <br /> Wisconsin Dane,and Dodge Counties,Wisconsin <br /> In coordination with the Wisconsin Department of Natural Led wetland determination and delineation survey and GPS- <br /> Resources(WDNR),assessed the potential for threatened and based survey of environmental features within a 3o mile <br /> endangered species to be present and assessed the potential of stretch of US Hwy 151 at eight locations requiring guardrail <br /> project related impacts for a proposed 3 mile gas main repair and maintenance. Reviewed field collected data and <br /> extension.Prepared final report,submitted to WDNR,and prepared final report. <br /> received WDNR approval. <br /> *denotes projects completed with other firms <br />