Laserfiche WebLink
Mr. Norm Hanson - . <br /> August 29,'1996 <br /> Page 4 <br /> COST ESTIMATE <br /> CTH BB/Kennedy Road <br /> Turn Lane <br /> Item Quantity Unit Cost ($) Total Cost <br /> Curb & Gutter 250 feet $10/foot $2,500 <br /> 18-Inch CMP 280 feet $25/foot $7,000 <br /> Manhole 1 each $1,600 each $1,600 <br /> Base Course 800 cu. yd. $3/cu. yd. $2,400 <br /> Asphalt 85 tons $32/ton $2,750 <br /> Unclassified Excavation 1 lump sum $7,000 $7,000 <br /> Topsoil/Seed/Fertilizer 1 lump sum $1,000 $1,000 <br /> Miscellaneous $5,000 <br /> TOTAL: $29,250 <br /> W128A003\W128-96B <br />