Laserfiche WebLink
DANE COUNTY <br /> LAND CONSERVATION DEPARTMENT <br /> FEN OAK RESOURCE CENTER <br /> 1 Fen Oak Court,Room 208,Madison WI 53718-8812 <br /> PH: 608-224-3730*FAX: 608-224-3745 <br /> Date: 2/16/98 <br /> To: Jim Gregorius <br /> Dane County Zoning <br /> From: Patrick J Sutter <br /> Soil &Water Conservationist <br /> Regarding Review & Comments <br /> Zoning Petition#7151 <br /> Applicant: David and Lori Yelk <br /> Soil erosion control issues and recommendations: <br /> Lots 1, & 2 have small drainage's (30ac or less) through them. These drainage's have the <br /> potential of carrying sediment to a near by waterway and then to the stream. The erosion control <br /> plan will need to consider the location of the driveway, septic, house, and any other out building <br /> as to prevent erosion during the construction phase. <br /> Compatibility with priority watershed plan for area: <br /> Black Earth Creek Watershed: All parcels listed are enrolled in Wisconsin's Nonpoint Source <br /> Water Pollution Abatement Program. Cost share funds have been provided to the previous owner <br /> in return for the installation , operation and maintenance of best management practices(BMPs) <br /> in conformance with s.144.25,Wis. Stats., and ch. NR 120, Wis. Adm. Code. <br /> Farm productivity of lands identified for development: <br /> Soil type lot 1: SmD2, TrB, ChB, DsC2, lot 2 KdD2, KrE2, MdC2, & MdD2 <br /> Capability unit: 4E, 2E, 2E, 3E,4E, 6E, 2E, &4E, respectively <br /> Corn Yield: 125, 145, 145, 100, 85, 0, 110, & 100 bushel/acre respectively <br /> Development appropriate given soil types/characteristics: <br /> Rating-Class: Medium, Medium, High, High, Medium, Medium, Medium, <br /> Medium respectively <br /> ectiv <br /> e <br /> ly <br /> Potential Building Limitation: Slope <br /> Continuing Limitations: Maintain erosion control measures <br /> Others: RECEIVED <br /> D.C.PLANNING&DEVELOPMENT. <br /> - <br /> PROPERTY RECORL.S <br /> 1 <br />