|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01418
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01418
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 1:32:45 PM
Creation date
11/23/2015 2:53:22 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01418
Town
Roxbury Township
Section Numbers
3
AccelaLink
DCPCUP-0000-01418
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br /> Page l <br /> COND IT <br /> IONt u <br /> gC E O P <br /> E T <br /> #1418 <br /> THE ZONING NATURAL RESOURCES COMMITTEE OF THE <br /> D <br /> AE <br /> O <br /> � <br /> TY BOARD <br /> PURSUANT SECTION OF THE DANE COUNTY COD ORDINANCES <br /> DOES HEREBY: <br /> GRANT the conditional use perm it subject to conditions. <br /> FOR; Miner al extraction site. <br /> EFFECTIVE DATE OF PERMIT 1/20/98 EXPIRATION DATE: /20/2001 <br /> PROPERTY DESCRIED AS <br /> IAC .TED ON THE P <br /> CONDITIONAL USE SHALL BE � 1/9 of Section <br /> THE COND l/4 of the Commencing at the the FOLLOWS located in the as follows: South Q00t thence West <br /> of land described A parcel <br /> of Roxbury of said $ectntin e South 550e feet to the <br /> corner a co East Northeast beginning;h rthe850 feet; thence <br /> point ° thence NO <br /> 5 0 feet; beginning <br /> C01`�ITIONS this permit, <br /> point app su fable to <br /> grounds <br /> for <br /> made sufficient specifically shall be <br /> conditions are eh conditions These °f such CUP site ar <br /> any violation this permit• plan covering the entire control p ton site, and receive appro <br /> revocation submit erosion extract the CUP site. <br /> applicant shall non-conforming extraction permit for all allay <br /> 1. The an e of the existing rmit <br /> the ensue area prior to beginning <br /> exception <br /> t <br /> of an erosion control permit p Crystal Lake or the pon <br /> 1 for are rwithin 300 feet of Cry <br /> applicant shall apply such areas' <br /> 2 The app extraction in state, an( <br /> proposed for he excavation ehpnr to beginning er required local, <br /> southeast of the apply for an receive all oth <br /> The applicants professional compl <br /> 3. qualified p lts of that <br /> permits. expense,have a q t the results l at his exp site and submit extract' <br /> 4 The operator shall, e of the CUP riot to beginning chaec <br /> archaeological survey Zoning Division prior <br /> periodic ar <br /> wn h and County at his expense, The oPF <br /> T also, of top sod layers. <br /> The operator ed removal <br /> site. performed during cal sites. <br /> inspections P rotected archaeological disturbing any p <br />
The URL can be used to link to this page
Your browser does not support the video tag.