|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00938
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00938
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 10:48:57 AM
Creation date
11/30/2015 2:56:06 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00938
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I was billed for amount far exceeding contract amount.When we contacted Dan Birrenkott about overages Dan <br /> Birrenkott stated the project was more work than they considered which is either untrue or an oversite by Dan <br /> Birrenkott because the City of Madison Engineering Department supplied Dan Birrenkott with a scope of work. In an <br /> attempt to keep the project moving forward remaining balance of invoice overages was escrowed to be paid as work <br /> was completed.An"As Built"survey required by the City of Madison Engineering shows the work provided by Dan <br /> Birrenkott was done incorrectly and will be to redone at an estimated cost of$68,000. Estimate was provided by The <br /> City of Madison Engineering Department. Dan Birrenkott has also taken it upon himself to have private meetings <br /> regarding the As Built information with the City of Madison Engineering Department without informing me. As things <br /> stand currently I have an incomplete land development that will require$68,000 in repairs due to Dan Birrenkott and <br /> Dan Birrenkott will not respond to any inquiries. <br />
The URL can be used to link to this page
Your browser does not support the video tag.