|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-06987
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-06987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2015 2:39:21 PM
Creation date
12/3/2015 2:36:14 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
06987
Town
Burke Township
Section Numbers
20
AccelaLink
DCPREZ-0000-06987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, . <br /> . . <br /> . .. Dane County Regional 'It. 1 <br /> Airport <br /> Runway 3/21 Construction Project <br /> Intersection -: R �y at 13/31 next <br /> iiiia r <br /> Construction activities are <br /> progressing on schedule. In the "' . <br /> past few weeks, the weather has ``' <br /> cooperated to allow no interruptions • <br /> to the grading work. The following <br /> items have been worked on: <br /> • Continued tree and brush <br /> clearing north and south of <br /> Messerschmidt Road The new runway will lie diagonally between the <br /> • Grading for the north end of the two existing runways. Map indicates intersection .r. <br /> runway and the runway safety to be developed in Phase IB(blue box) -�`_ - <br /> area (Runway 21) 1i�∎omit:". <br /> the new Runway 3/21 and its 1!!‘ Er <br /> • Grading for the north perimeter parallel taxiway will be completed. •,V �,7C. <br /> road This construction will be finished by _�' ,l` <br /> • Stripping the borrow site at mid-July and will consist of pave- • iv,Highway CV and Messerschmidt ment removal, storm sewer work, ' <br /> Road �~ �.5.Highway <br /> earthwork, paving of both the <br /> • Installation of the relocated FAA asphaltic base and the concrete <br /> radar cable surface, and runway and taxiway end of the new runway including <br /> • Completed the temporary lighting. substantial storm sewer work and <br /> relocation of the north perimeter This phase must be done in a excavation from the borrow pilots <br /> fence tight time frame as it closes Runway along Highway CV and Highway 51. <br /> 13/31 which is the airport's second- <br /> What's happening next ary aircarrier runway and one <br /> The next step of this exciting of only two runways that <br /> project, Phase IB, will begin the handles a majority of the <br /> week of June 18 (see project k' commercial airline traffic DANE <br /> schedule on reverse). In Phase IB at the airport. COUNTY <br /> the construction of the intersec- While Phase IB �� REGIONAL <br /> lion the existing Runway progresses, work will AIRPORT <br /> 13/31 and continue on the Mike Kirchner <br /> grading of the 4000 International Lane <br /> North Madison, WI 53704 <br /> � <br /> - 608-246-3393 <br /> The goal of this runway s to ~ , ` "` Volume 1, Issue 2 <br /> help alleviate existing and future `�' .� June, 1997 <br /> aircraft noise problems over the <br /> more populated areas south o f the P A , E N G I N E E R S <br /> airport. ARCHITECTS <br /> %W.' S C I E N T I S T S <br /> P L A N N E R5 <br /> ,roir,iiiirm yr- <br /> . 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.