|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00940
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00940
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 10:29:44 AM
Creation date
12/10/2015 10:16:20 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00940
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dane County Water Resource Engineering Division <br /> DINAP - "Do I NEED A PERMIT" <br /> General Information: <br /> Date of Contact: 10/28/2015 <br /> Caller/Contact: David Aide, Genes Diffusion Phone#: <br /> Landowner: Genes Diffusion, Inc. Phone#: <br /> Contact Email: aidel @litewire.net <br /> Project Address: 510 US Highway 51 <br /> Location(Municipality): Dunkirk Section: 1 1/4: SW <br /> Parcel#: 0511-014-9001-2 <br /> Project Description: Construct a 34' x 64' pole shed over existing impervious. <br /> Planned Size of Disturbance: <4,000 ft2 lanned Size of New Impervious: 0 ft-2 <br /> Water Resource Engineering Division Response: <br /> Based On Information Above the Project:0 DOES* IN DOES NOT Require a Permit <br /> Determination Made by: ❑RLS DDB ❑JAS EJAH 0 JRT EAJM ❑JRR <br /> Type of Permit Required: ['Erosion Control ❑Shoreland Erosion Control ❑Stormwater Management <br /> ❑Disturbance >4000 ft2 ❑ Excavate/Fill>400 yds3 ❑ Disturbing 100' of ditch/channel <br /> ❑ 125'Long new access road/driveway❑ Subdivision Plat/CSM ❑ 20,000 ft2 New Impervious areas <br /> ❑Shoreland Zone Disturbance ❑ Other: <br /> Basis for Determination: Project is not located in the shoreland zone and does not include <br /> land disturbing activity in excess of 4,000 sq. ft. Any land disturbing activity <br /> exceeding 4,000 sq. ft. will require an erosion control and stormwater management <br /> permit. <br /> Permit determination is based upon the information provided by caller/landowner on the date of contact. <br /> Changes in project size,scope or location may trigger changes to permit requirements. <br /> It is the responsibility of the owner to ensure all required permits have been obtained prior to commencing work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.