Laserfiche WebLink
MICHAEL MCCORMICK Page 2 11/16/2015 <br /> A full size copy of the approved plans,specifications and this letter shall be on-site during construction and open to <br /> inspection by authorized representatives of the Department,which may include local inspectors.If plan index sheets <br /> were submitted in lieu of additional full plan sets,a copy of this approval letter and index sheet shall be attached to <br /> plans that correspond with the copy on file with the Department. If these plans were submitted in an electronic form, <br /> the designer is responsible to download,print,and bind the full size set of plans along with our approval letter. A <br /> department electronic stamp and signature shall be on the plans which are used at the job site for construction. <br /> All permits required by the state or the local municipality shall be obtained prior to commencement of <br /> construction/installation/operation. You are responsible for complying with state and federal laws concerning <br /> construction near or on wetlands,lakes,and streams. For more information,visit the Department of Natural <br /> Resources wetlands identification web page or contact a Department of Natural Resources service center.Nothing in <br /> this approval limits the power of municipalities to make or enforce additional or more stringent regulations, <br /> providing the regulations do not conflict with this code or any other rule of the department or any law.This plan has <br /> not been generally reviewed for compliance with fire code requirements,including those for fire lanes and fire <br /> protection water supply,so contact the local fire department for further information. <br /> If this construction project will disturb one or more acres of land,a Water Resources Application for Project Permits <br /> (WRAPP)(previously known as the Notice of Intent)shall be filed with the Department of Natural Resources prior <br /> to any land-disturbing activities. More information regarding the DNR's permitting requirements for runoff <br /> management for construction sites can be found at the DNR's website, <br /> http://dnr.wi.gov/topic/stormwater/construction/ <br /> In granting this approval,the Division of Industry Services reserves the right to require changes or additions, should <br /> conditions arise making them necessary for code compliance.As per stateltats 101.12(2),nothing in this review <br /> shall relieve the designer of the responsibility for designing a safe building,structure,or component. The Division <br /> does not take responsibility for the design or construction of the reviewed items. <br /> Per s. SPS 361.40(4),projects for buildings of over 50,000 cubic feet total volume shall have supervising <br /> professionals who file compliance statements with this agency and the local code officials prior to occupancy of the <br /> project. The compliance statement form is available on our website, <br /> http://dsps.wi ov/Documents/Industry%20Services/Forms/Commercial%20Buildings/Combined%20Worksheets%2 <br /> Olnstructions%20 2009%20ICC .pdf under forms for commercial buildings. <br /> Inquiries concerning this correspondence may be made to me at the telephone number listed below,or at the address <br /> o is etterhead. We look forward to working with you to make this code-compliant construction. <br /> S cere , Fee Required$ 800.00 <br /> This Amount Will Be Invoiced. <br /> 114, When You Receive That Invoice, <br /> David Wallace,P.E. Please Include a Copy With Your <br /> Engineering Consultant,Division of Industry Services Payment Submittal. <br /> (608)261-6540,7:45-4:30 WiSMART code: 7648 <br /> david.wallace@wisconsin.gov <br /> cc: Waylon A Kannenberg,Blue Vista Farm LLC <br /> Steve Gothard,State Building Inspector,(608)235-0568 ,Monday 7:45 A.M. -4:30 P.M. <br /> Note: Effective May 7,2012,Effective immediately,the Division of Industry Services Commercial Building <br /> Program will no longer require the submittal of either emergency egress lighting plans or lighting energy <br /> conservation plans to our agency. Instead following are revised expectations: <br /> • Emergency Egress Lighting-Building designers shall provide at the project site an egress plan showing <br /> where exit lights and emergency egress lighting will be required for new buildings,additions and alterations <br /> that create new egress paths. Effective July 1,2012,this egress plan shall be included with the building <br /> plan submittal to our agency. In addition to the egress plan at the jobsite,there shall be emergency <br /> lighting cut-sheets,calculations or other means to show compliance of the installed fixtures. Local <br /> inspectors may request additional information. <br /> • Energy Conservation—Building designers,electrical designers or electrical contractors shall provide fixture <br /> layouts,fixture cut-sheet,energy calculations or other documentation at the project site. <br />