Laserfiche WebLink
„Hit, mAUAGEMEU`T INC. ; <br /> 8-18-95 1: <br /> 05PM ;WWI EMD!PROJECT MGMT-DANE Co TREASURER <br /> (iv) Where <br /> not canfarmothe remedial action selected by <br /> not <br /> a a State standard and the State has initiated <br /> suit against the Environmental Protection Age has does <br /> to seek to have the remedial initiated a law <br /> standard. the President shall conform conformpt prior to May 1, <br /> I' State standard, <br /> The State onform the remedial soon <br /> I off-site facility shall assure the availability to the <br /> 1 Y for such remedial action, <br /> y of an <br /> the(transfer the <br /> ofcase <br /> an of an <br /> Y hazardous removal <br /> substancemorial <br /> contaminant offside action involving <br /> contaminant shall only hazardous or substance pollutant or <br /> contatin y be transferredutotanfacili whih or <br /> operating section 3004 and 3005 Y which is <br /> Disposal A Control where applicable, in ome Solid Waste <br /> Act or other a in compliance with the <br /> applicable State Act requirements. applicable Federal `fall <br /> contaminant may be transferred to substance or pollutantdonll <br /> if the President determines a land die <br /> requirements are metr Posal facility only <br /> that both of the following <br /> ; <br /> (A) The unit <br /> contaminant to which the hazardous substance or <br /> co constituent thereof, is not releasing <br /> oril. , into the a any suzfrceus water groundwater or surface water or <br /> (B) All such releases ' <br /> being controlled by from other units at the <br /> Administrator under auboireetive action, facility are <br /> The president mall subtitle of the soliddgWastepDispos by the <br /> Th determinations under this the owner of Disposal Act. <br /> or operator of such facility <br /> paragraph. <br /> (4) The President may <br /> requirements of paragraph select a remedial action meeting <br /> require of control Pa (1) that does g the <br /> St relevant of <br /> and appropriate l at least equivalent tot a attain legally a levei or <br /> limieation as re standard, re c applicable <br /> limitation <br /> ara ra required by paragraph (2)requirement, criteria, or <br /> p as <br /> ph thereof) , ) (includin <br /> ( ► if the President findsutMa��graph <br /> (A) the remedial action selected is and <br /> remedial action that w <br /> control when completed;ll attain such level part of a total <br /> standard of <br /> (B) compliance with such requirement at that <br /> alternative in greater risk to human health and th <br /> result <br /> o t facility will <br /> options; <br /> the environment than <br /> (C) compliance with such requirements is technically impracticable from an engineering perspective;(D) the remedial action <br /> selected will attain <br /> a standard of <br /> P. c 5 <br /> Copyright 1995 The Bureau of National Affairs, Inc. <br />