|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00888
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 1:20:15 PM
Creation date
12/14/2015 11:19:24 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00888
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ewifii Water Resource Engineering Division <br /> Dane County Land&Water Resources Department <br /> ?49II Jeremy Balousek,P.E.,Division Manager <br /> CON= <br /> DATE: October 27, 2015 <br /> TO: Stacey Bean <br /> Unbridled Spirits LLC <br /> FROM: Jeremy Balousek, P.E. <br /> FROM: <br /> Oft CI*111f,Balousek <br /> Balousek,P.E. <br /> D.W.2015.103715 191)6-05.00. <br /> RE: Indigo Trails Indoor Arena—Stormwater Management Plan,5M2015-0384 <br /> Associated Permit EC2015-0383 <br /> The submitted stormwater management plan meets the needs of the site. The plan includes the <br /> following requirements: <br /> 1. Bioretention and infiltration basins must be constructed once the tributary areas have <br /> been stabilized. Care must be taken to prevent runoff from disturbed areas from <br /> entering the facilities, once they have been constructed and stabilized. The basins must <br /> be installed and planted as specified in the plan. <br /> 2. The maintenance agreement for permanent stormwater management practices must be <br /> recorded with the Register of Deeds and a financial security document for 110%of the <br /> expected cost of erosion control and stormwater management ($6,839) must be <br /> submitted prior to permit issuance. <br /> 3. As-built plans and certification, performed by a professional engineer, will be required <br /> for all permanent stormwater management practices and facilities. <br /> This permit does not expire. This review is for the stormwater requirements of Chapter 14, <br /> Dane County Code of Ordinances only and other approvals may be necessary.The applicant <br /> must obtain a permit card from the Water Resource Engineering Division counter and display it <br /> on the site. <br /> Cc: Katie MacDonald, P.E., Ayres Associates (by email) <br /> Lyman F.Anderson Agriculture&Conservation Center <br /> 5201 Fen Oak Drive,Room 208,Madison,Wisconsin 53718-PH:608/224-3730,FAX:608/224-3745 <br />
The URL can be used to link to this page
Your browser does not support the video tag.