Laserfiche WebLink
#1021 <br /> Page 2 <br /> 6. That the proposed conditional use does conform to all <br /> applicable regulations of the district in which it is <br /> proposed to be located. <br /> (FOR USE ONLY WITH CUP IN A-1 EX ZONING - For Conditional Uses in <br /> the A-1 EX Agriculture District, the following additional findings <br /> need to be included: ) <br /> 7. This use will benefit the needs of either the residents or <br /> the agricultural activities in the area. <br /> 8 . There are not other locations available for this use. <br /> 9 . The land to be occupied by this use is not productive <br /> agricultural land. <br /> 10. Public services needed by this use are available. <br /> 11. Public services needed by this use can be furnished without <br /> becoming an unreasonable burden on the taxpayers. <br /> 12 . This use at this location will not cause significant harm to <br /> the environment. <br /> EXPIRATION OF PERMIT <br /> Section 10.25 (2) (n) of the Dane County Code of Ordinances provides <br /> that any use for which a conditional use permit has been issued, <br /> upon its cessation or abandonment for a period of one year, will be <br /> deemed to have been terminated and any future use shall be in <br /> conformity with the ordinance. <br /> CONDITIONS: <br /> ] . Blasting shall be limited to a maximim of 2i PPV at the location of <br /> f. <br /> the Koch pipeline. <br /> 2. Siesmograph readings shall be takeh for each blasting operation and said readings print <br /> out shall be submitted to the town Board <br /> 3. The quarry excavation shall not emtERA extend further South than 400' from the <br /> South line of the existing C.U.P. x`257 <br /> 4. Liability insurance coverage for the the Quarry shall sunk be increased to <br /> $5,000,000.00 and maintaned at the level untill Quarry is closed. Proof of said <br /> coverage shall be submitted to the Town Board. <br /> 5. The C.U.P. shall be for period of 20 years <br />