Laserfiche WebLink
CUp <br /> // • . a ) <br /> Conditions C U P #? 4106. Qcci5 <br /> ao-c- <br /> 1 . Hauling shall be - Cross Country Road to the Landfill . ' <br /> ( 2 . Hauling shall be limited to one season in � i9C 5 <br /> 3 . There shall be a gradual feathered slope in all detention <br /> basins and ponds . No ver"tical walls . <br /> • <br /> 4 . In regards to dust , the Town Chairperson, if after <br /> physically viewing the site , deems that dust is causing a <br /> problem, will have the right to shut the job down until <br /> _ ._ control measures correcting the problem can be implemented . <br /> 5 . Approximately ten acres of land will be opened up for clay <br /> extraction at one time . When the excavation is complete on <br /> the first ten acres , the next ten acres will be stripped of <br /> topsoil . That topsoil will then be placed on the first ten <br /> acres stripped . This procedure will then •be repeated for <br /> the following acres . After the topsoil is replaced, it will <br /> be graded and seeded . <br /> 6 . Soil erosion control will be required and enforced . <br /> Siltation fences shall be constructed as required . <br /> 7 . Hours of operation shall be 6 : 30 am to 5 : 30 pm. Truck <br /> hauling shall be limited to 7 : 00 am . to 4 : 00 pm. The <br /> intent is that work days shall be Monday through Friday with <br /> the exception of an occasional Saturday for rain make-up . <br /> • <br /> 8 . A good faith effort shall be made to leave several inches of <br /> clay on site . Surface of topsoil will be prepared prior to <br /> seeding such that roots could be established . <br /> 9 . The land shall be kept in grassland/hay production for an <br /> initial five year period to allow soil structure to become <br /> re-established, and to assure no harmful effects to area <br /> groundwater . <br /> 10 . After this initial period , the reintroduction of a more <br /> intense land use such as row-crop agriculture may be allowed <br /> based on soil test results and committee approval . <br /> 11 . The Town of Verona Board will be notified of any requested <br /> changes in -land use . <br /> , 12 . Soil testing hall include remapping based on soil borings'. <br /> In addition, test plots shall be done to determine yields on <br /> . the rebuilt soil so future nitrogen can be closely tied to <br /> yield expectations . <br /> 13 . Groundwater monitoring wells may also be required . <br /> 14 . Land use must follow State Standards for nutrients and <br /> pesticides currently being set by ..the UW, State and Federal • <br /> agencies . (These standards will be in effect before a <br />