Laserfiche WebLink
. MADISON METROPOLITAN <br /> SEWERAGE DISTRICT <br /> feWals•MO.,�, COMMISSIONERS <br /> IMINWSOMOw <br /> — ^^ Lawrence B.Polkowski <br /> 1610 Moorland Road President <br /> . -_ „ � ~O Edward V.Schten <br /> %wow Madison, WI 53713-3398 '-- �.• Vice-President <br /> Telephone (608) MIAOW Thomas D.Hovel <br /> Fax (608) 222-2703 ve0Wat. Eugene Secretary Gehl <br /> eCommissioner <br /> Caryl E.Terrell <br /> James L.Nemke <br /> Chief Engineer&Director _ Commissioner <br /> D <br /> March 4, 1996 <br /> mkt Dane County Zoning Department 5 ' <br /> City County Building - Room 116 <br /> 210 Martin Luther King Blvd. <br /> Madison, Wi 53709 D.C. PLANNING &Dr <br /> ZONING DIVIS,Ora <br /> Subject: Zoning Petition#6522 <br /> 3222 Larsen Rd <br /> Town of Blooming Grove <br /> To whom it may concern: <br /> The District has a 27" sanitary sewer interceptor that is located within the above <br /> mentioned property. The sewer crosses northwesterly through the property from <br /> Meadowview Road near Zuercher Court and then heads-north through the proposed R-3 <br /> parcel approximately 200 feet east of Larsen Road as shown on the attached sewer map. <br /> Please note the location of manhole 11-204. It is located near the southerly lot line of the <br /> R-3 parcel. <br /> This facility provides sewer service for the area lying west of Lake Waubesa. The <br /> District has an easement for this facility. No buildings or permanent structures are to be <br /> built over the sewer line or within the easement area. We are not opposed to the <br /> construction of parking lots, driveways or temporary storage buildings that could be torn <br /> down in case of an emergency. Access to the manhole for maintenance and inspection is <br /> important and should be kept in mind during grading and restoration of the lot. Any <br /> connections to the sewer line are to be made at manhole 11-204 or a new manhole <br /> constructed over the sewer line at a convenient location. All connections are to be <br /> inspected by District personnel. <br /> Thank you for the opportunity to comment on the zoning request. <br /> Since - y, <br /> erald E. Sas s, P.E. <br /> Staff Engineer <br /> etrogro <br />