|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00985
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00985
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 12:31:27 PM
Creation date
1/7/2016 4:08:39 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10/19/2015 Workspace Wetxnail::Print <br /> Print I Close Window <br /> Subject: Fwd:Schutt Driveway Review Comments <br /> From: Eric Schutt<EricSchutt@aol.com> <br /> Date: Mon,Oct 19,2015 11:13 am <br /> To: "<jason@alterrahomes.com>"<Jason@alterrahomes.com> <br /> Attach: SCHUTT DRIVEWAY-Erosion Opin Cost.pdf <br /> SCHUTT DRIVEWAY-Project Description.pdf <br /> SCHUTT DRIVEWAY-GEC.pdf <br /> Sent from my iPhone <br /> Begin forwarded message: <br /> >From:Josh Meyerhofer<jmeyerhofer@donofrio.cc> <br /> >Date:October 13,2015 at 4:17:53 PM CDT <br /> >To:"Tuggle,Jason"<tuggle.jason @countyofdane.com> <br /> >Cc:Eric Schutt<EricSchutt@aol.com>,Bruce Hollar<bhollar @donofrio.cc> <br /> >Subject RE:Schutt Driveway Review Comments <br /> >Jason, <br /> >I've gone through and incorporated the comments you had. <br /> > 1.The 1,900 ft was not used for calculating the impervious areas in the development That was just a typing error as the <br /> alignment starts at 10+00 and continues up to the proposed buildings around 19+00.The 700'driveway was used for all <br /> calculations and was updated in the project description (attached). <br /> >2.Eric addressed in previous email. <br /> >3. Updated and shown in GEC(attached). <br /> >4.Updated and shown in GEC (attached). <br /> >5.Additional rock check dams and restoration measures,including erosion matting,have been included in cost estimate <br /> (attached). <br /> >Let me know if there is anything else that should be addressed. <br /> >Thanks, <br /> >Josh <br /> >Josh Meyerhofer <br /> >D'Onofrio Kottke and Associates I E.I.T. <br /> >7530 Westward Way I Madison,WI 53717 <br /> >Phone(608)833-7530 I Fax(608)833-1089 <br /> >jeyerhofer@donofrio.cc J www.donofrio.cc <br /> >From:Eric Schutt[mailto:EricSchutt@aol.com] <br /> >Sent:Tuesday,October 13,2015 3:08 PM <br /> >To:Tuggle,Jason <br /> >Cc:Josh Meyerhofer <br /> >Subject Re:Schutt Driveway Review Comments <br /> >Jason, <br /> • >On the one question I can answer,we own both parcels and have filed a deed restriction between the two,so in <br /> essence they are one. <br /> >Thanks, <br /> >Eric <br /> tttpsi/emai124.secureserver.net/viewJrint mtiti.php?uidArray=45811IINBOX&aEmlPart=O 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.