|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2015-00989
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2015
>
DCPZP-2015-00989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 12:31:40 PM
Creation date
1/8/2016 1:45:53 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2015-00989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page—,4.5 of <br /> All other services, including but not limited to the servicing of effluent filters, mechanical or pressurized components, pretreatment units, and any <br /> servicing at intervals of s12 months,shall be performed by a certified POWTS Maintainer. <br /> A service report shall be provided to the Environmental Health and Labs Division of Public Health Madison and Dane County within 30 days of <br /> completion of any service event <br /> START UP AND OPERATION <br /> For new construction,prior to use of the POWTS,check treatment tank(s)for the presence of painting products,solvents or other chemicals or sediment <br /> that may impede the treatment process and/or damage the soil absorption cell(s).If high amounts of these materials are detected in the tanks,have the <br /> contents of the tank(s)removed by a septage servicing operator prior to use. <br /> System start up shall not occur when soil conditions are frozen at the infiltrative surface. <br /> During extended power outages pump tanks may fill above normal high water levels.When power is restored the excess wastewater will be discharged <br /> to the dispersal cell(s)in one large dose and may overload them resulting in the backup or surface discharge of effluent To avoid this situation have the <br /> contests of the pump tank removed by a Septage Servicing Operator prior to restoring power to the effluent pump or contact a Plumber or POWTS <br /> Maintainer to assist in manually operating the pump controls to restore normal levels within the pump tank. <br /> Do not drive or park vehicles over tanks and dispersal cells.Do not drive or park over, or otherwise disturb or compact,the area within 15 feet down <br /> slope of any mound or at-grade soil absorption area. <br /> Reduction or elimination of the following from the wastewater stream may improve the performance and prolong the life of the POWTS:antibiotics,baby <br /> wipes, cigarette butts, condoms, cotton swabs,degreasers, dental floss,diapers,disinfectants,fat,foundation drain (sump pump)discharge,fruit and <br /> vegetable peelings,gasoline, greases, herbicides,meat scraps,medidations,oils,painting products,pesticides,sanitary napkins,tampons,and water <br /> softener brine. <br /> ABANDONMENT <br /> When the POWTS fails and/or is permanently taken out of service the following steps shall be taken to insure that the system Is properly and safely <br /> abandoned in compliance with s. SPS383.33,Wisconsin Administrative Code: <br /> • All piping to tanks,pits and other soil absorption systems shall be disconnected and the abandoned pipe openings sealed. <br /> • The contents of all tanks and pits shall be removed and properly disposed of by a Septage Servicing Operator(pumper). <br /> • After pumping,all tanks and pits shall be excavated and removed or their covers removed and the void space filled with soil,gravel or another inert <br /> solid material.' <br /> CONTINGENCY PLAN <br /> If the POWTS fails and cannot be repaired the following measures have been,or must be taken,to provide a code compliant replacement system: <br /> IS' A suitable replacement area has been evaluated and may be utilized for the location of a replacement soil absorption system.The replacement <br /> area should be protected from disturbance and compaction and should not be infringed upon by required setbacks from,existing and proposed <br /> structure,lot lines and wells.Failure to protect the replacement area will result in the need for a new soil and site evaluation to establish a suitable <br /> replacement area.Replacement systems must comply with the rules in effect at the time of their permit issuance. <br /> ❑ A suitable replacement area is not available due to setback and/or soil limitations.If the soil absorption system cannot be rehabilitated and barring <br /> advances In POWTS technology,a holding tank may be installed as a last resort. <br /> ❑ The site has not been evaluated to identify a suitable replacement area.Upon failure of the POWTS a soil and site evaluation must be performed to <br /> locate a suitable replacement area.If no replacement area is available a holding tank may be installed as a last resort to replace the failed POWTS. <br /> ❑ Mound and at grade soil absorption systems may be reconstructed in place following removal of the biomat at the infiltrative surface. <br /> Reconstructions of such systems must comply with the rules In effect at that time. <br /> WARNING: TREATMENT TANKS AND HOLDING TANKS MAY CONTAIN POISONOUS GASSES AND LACK SUFFICIENT <br /> nOXYGEN TO SUPPORT LIFE. NEVER. ENTER A TREATMENT TANK OR HOLDING TANK UNDER ANY <br /> CIRCUMSTANCE. DEATH MAY RESULT. ESCAPE OR RESCUE FROM THE INTERIOR OF A TANK IS VERY <br /> f DIFFICULT. <br /> ADDITIONAL INFORMATION: <br /> POWTS INSTALLER POWTS MAINTAINER <br /> Name: Name: <br /> Phone: Phone: <br /> SEPTAGE SERVICING OPERATOR(PUMPER) LOCAL REGULATORY AUTHORITY <br /> Name: Name: Public Health-Madison & Dane County <br /> Phone: Phone: 608-242-6515 <br /> This document is Intended to meet minimum requirements of Ch. SPS383.22(2)(b)(1)(d)&(f)and383.54(1), (2)& (3),Wisconsin Administrative Code. <br /> Use of this document does not guarantee the performance of the POWTS. <br /> 3/8/2010-POW TSMGTplan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.