|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2015-02332
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2015
>
DCPCUP-2015-02332
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/13/2016 12:03:53 PM
Creation date
1/13/2016 12:03:51 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02332
Town
Madison Township
Section Numbers
34
AccelaLink
DCPCUP-2015-02332
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- � � Dane County Zoning Division <br /> � 'h City-County Building <br /> I �, 210 Martin Luther King,Jr.,Blvd.,Room 116 <br /> 11 Madison Wisconsin 53703 <br /> ‘1- , <br /> . t' #//s (608) 266-4266/266-9083 Fax (608) 267-1540 <br /> DANE COUNTY <br /> CONDITIONAL USE PERMIT #2332 <br /> THE ZONING AND LAND REGULATION COMMITTEE OF THE DANE COUNTY <br /> BOARD PURSUANT TO SECTION 10.255(2) OF THE DANE COUNTY CODE OF <br /> ORDINANCES DOES HEREBY: <br /> GRANT Conditional Use Permit#2332 for a communication tower pursuant to Dane <br /> County Code of Ordinances Section 10.194 and subject to any conditions contained <br /> herein. <br /> EFFECTIVE DATE OF PERMIT: January 13, 2016 <br /> Expiration Date: May 1, 2016 <br /> THE CONDITIONAL USE SHALL BE LOCATED ON THE PROPERTY DESCRIBED AS <br /> FOLLOWS: <br /> 1906 W. Beltline Highway, Town of Madison, Dane County, Wisconsin <br /> Note: Renewal of CUP#2297. <br /> CONDITIONS: <br /> 1. The primary use of the communication tower permitted under Conditional Use Permit No. 2232 <br /> shall be for the transmission and reception of cellular/PCS wireless voice/data <br /> communications, and related telecommunications equipment. <br /> 2. The communication tower placed, constructed or modified under Conditional Use Permit No. <br /> 2232 shall accommodate the collocation of telecommunications equipment for at least two (2) <br /> additional telecommunications providers. The maximum height of the tower shall not exceed <br /> 150 feet above ground level. <br /> 3. The minimum of two(2) collocation sites required hereunder need not be available on the tower <br /> as initially placed, constructed, or modified, provided that the tower will support the later addition <br /> of the collocation sites as specified in condition#2, above. <br /> 4. Collocation sites required hereunder shall, upon request, be made available by the holder of <br /> Conditional Use Permit No. 2232 for the mounting of technologically compatible antenna arrays <br /> and equipment at the prevailing market rate in the region and upon contractual provisions which <br /> are standard in the industry. <br /> 5. The holder of Conditional Use Permit No. 2232 is permitted, if needed, to construct a building of <br /> no more than 14 feet in height(as defined in section 10.01 (8)of the Dane County Zoning <br /> Ordinance in effect in March 1997)and 314 square feet in floor area for use directly incidental <br /> and necessary to the use of the tower. Any other user collocating on the tower permitted herein <br /> is permitted to construct a building of no more than 14 feet in height(as defined in section 10.01 <br /> H:\Zoning\ZLR\Conditional Use Permits\CUP 2300's\CUP #2332.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.