|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2015-02312
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-2015-02312
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2016 11:40:52 AM
Creation date
1/26/2016 11:39:49 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02312
Town
Springdale Township
Section Numbers
34
AccelaLink
DCPCUP-2015-02312
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CERTIFIED SURVEY REQUIRED <br /> The above listed description/s is/are intended to describe land for which a certified <br /> survey map will be prepared for approval and recorded. Within 90 days of rezoning <br /> approval by Dane County, a final certified survey map that describes the land to be <br /> rezoned shall be prepared in accordance with all applicable provisions of Chapter <br /> 236 Wisconsin Statutes and Chapter 75 Dane County Code of Ordinances, and <br /> submitted to the Dane County Zoning Division. Upon submission of the final <br /> certified survey map, the Zoning and Land Regulation Committee, or its authorized <br /> representative, shall, within 30 days, approve, approve conditionally, or reject the <br /> certified survey map. Failure to submit the final certified survey within the 90 <br /> day period and/or failure to record the survey with the Dane County Register <br /> of Deeds will cause the rezone to be null and void. Two copies of the <br /> recorded survey shall be submitted to Dane County Zoning. <br />
The URL can be used to link to this page
Your browser does not support the video tag.