|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-2015-02333
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
2010s
>
2015
>
DCPCUP-2015-02333
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2016 11:57:17 AM
Creation date
1/26/2016 11:51:01 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
02333
Town
Christiana Township
Section Numbers
19
AccelaLink
DCPCUP-2015-02333
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposed Conditional Use Permit # 2333 <br /> 16.All blasting shall take place Monday through Friday, between the hours of 8 a.m. to noon and 1 pm to 4 <br /> pm. No blasting shall occur on weekends or holidays. <br /> 17.A 24-hour notice will be made to all residences/businesses within a 1/4 mile radius of the corners of the <br /> property, including any parties that have requested notification either via mail or email prior to any <br /> blasting. <br /> 18. No water shall be removed from the site. <br /> 19. No bulk fuel will be stored in any permanent tanks on site. <br /> 20.The operator shall require all trucks and excavation equipment have muffler systems that meet or exceed <br /> the current industry standards for noise abatement. <br /> 21.The applicant or its customers hauling material from the site will not use jake-brakes unless necessary for <br /> an emergency. <br /> 22. Extraction area shall be set back 30 feet from Washington Street, 42 feet from CTH W, and 5 feet from all <br /> other property lines. <br /> 23.The zoning administrator or designee may enter the premises of the operation to inspect those premises <br /> and to ascertain compliance with these conditions or to investigate an alleged violation. Unless the <br /> operation is in reasonable compliance with these conditions of approval, such approval is subject to <br /> amendment or revocation. Anyone inspecting the property will be escorted by the operator and will <br /> comply with all safety rules. <br /> 24. The Town of Christiana may request documentation of any Dane County inspections and permit renewals. <br /> 25. Conditional Use Permit for mineral extraction is for the operator R.G. Huston only. CUP#2333 is non- <br /> transferrable to a different operator. <br />
The URL can be used to link to this page
Your browser does not support the video tag.