Laserfiche WebLink
CONDITIONS PAGE 2 <br /> • CONDITIONAL USE PERMIT 1132 <br /> • These conditions are specifically made applicable to this permit, <br /> any violation of such conditions shall be sufficient grounds for <br /> revocation of this permit. <br /> 1. Hauling will be on USH 12-18 to the Landfill. <br /> 2. Approximately ten acres of land will be opened up for clay <br /> extraction at one time. When the excavation is complete on <br /> the first ten acres, the next ten acres will be stripped of <br /> topsoil. That topsoil will then be placed on the first ten <br /> acres stripped. This procedure will then be repeated for <br /> the following acres. After the topsoil is replaced it will <br /> be graded and seeded. <br /> 3 . Soil erosion control measures will be required and enforced. <br /> Siltation fences will be constructed as required. <br /> 4 . Hours of operation will be 6: 30 a.m. to 5: 30 p.m. Truck <br /> hauling will be limited to 8: 00 a.m. to 4:00 p.m. The <br /> intent is that work days shall be Monday through Friday with <br /> the exception of an occasional Saturday for rain make-up. <br /> 5. A good faith effort will be made to leave several inches of <br /> clay on site. Surface of topsoil will be prepared prior to <br /> seeding such that roots could be established. <br /> 6. The land will be kept in grassland/hay production for an <br /> initial five year period to allow soil structure to become <br /> re-established, and to assure no harmful effects to area <br /> groundwater. <br /> 7 . After this initial period, the reintroduction of a more <br /> intense land use such as row-crop agriculture may be allowed <br /> based on soil test results and committee approval. <br /> 8. The Town Board will be notified of any requested changes in <br /> land use. <br /> 9. Soil testing shall include remapping based on soil borings. <br /> In addition, test plots shall be done to determine yields on <br /> the rebuilt soil so future nitrogen can be closely tied to <br /> yield expectations. <br /> 10. Land use must follow State standards for nutrients and <br /> pesticides currently being set by the U.W. , State and <br /> Federal agencies. (These standards will be in effect before <br /> a petition for a land use change can be made, and they will <br /> establish specific soil series application rates for <br /> agricultural chemicals for the entire State of Wisconsin. ) <br /> 11. All construction equipment and vehicles will be fueled and <br /> • stored on land that has not had the clay removed. Farm <br /> equipment will also be stored and fueled on land that is not <br /> disturbed. <br />