|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01414
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01414
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 11:08:09 AM
Creation date
2/5/2016 11:00:21 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01414
Town
Cottage Grove Township
Section Numbers
30, 31
AccelaLink
DCPCUP-0000-01414
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.w. <br /> TOWN OF COTTAGE GROVE <br /> CONDITIONS FOR NON-METALLIC MINING PERMIT AND C.U.P. #1414 <br /> MARCH 17, 1997 <br /> 1. Complete compliance with TCG Chapter 17 Code of Ordinances. <br /> 2. Submission of map and legal description confirming that borrow area covers <br /> approximately 15 acres as identified on the topographical map submitted with the <br /> application. <br /> 3. Written confirmation that no effigy mound or similar sites are at the location. <br /> 4. Construction of deceleration lane eastbound of approximately 400 feet; construction <br /> of an acceleration lane westbound of approximately 600-800 feet; asphalt millings to <br /> minimize the dust. <br /> 5. All access through driveway to 12-18; no use of Hope Hollow or CTH AB; temporary <br /> permit to be obtained through the D.O.T. <br /> 6. Evidence of performance and payment bond in the amount of approximately 29 <br /> million dollars; copy of state contract. <br /> 7. Restoration bond in an amount to be set by designated engineer for the town as well as <br /> other such financial assurance as agreed to between town engineer,town attorney, and <br /> town chairman. <br /> 8. Duration of permit from date that conditions have been met through June 30, 1997, <br /> and all extensions requiring approval of town board. <br /> 9. Confirmation from owner of property that approval will not negatively impact his <br /> farming operation. <br /> 10. Completion of all work in accordance with application submitted to town board. <br /> 11. Payment of out-of-pocket expenses for legal and engineering review as incurred by <br /> town. <br />
The URL can be used to link to this page
Your browser does not support the video tag.