|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00011
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2016 12:34:13 PM
Creation date
2/8/2016 10:38:23 AM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A location survey, by a licensed surveyor, is required if your construction <br /> is within 10 feet of a setback line. <br /> • You will need to hire a surveyor to prepare a location survey to verify the construction location. <br /> • The survey shall be done at the time when foundations or basement walls are completed. <br /> • A location survey shall be submitted to the zoning office before continuing work on the project. <br /> • Note: A location survey may add significant cost to your project.Please contact a Wisconsin Licensed Land Surveyor. <br /> you may need this if . . . <br /> 33' 33' I I <br /> I I <br /> Front Setback area S 72°57'40" E 254.01' r Side Setback area <br /> • 1 Rear <br /> Setback <br /> O 1 O <br /> O <br /> �� 10 Feet F F <br /> 0 Needs a 4 W <br /> �� ••••.•••• Location / W <br /> Q w N Survey ~Setback W <br /> / Line <br /> O O / = Proposed 169.8' ~ op <br /> N Q Addition O <br /> CC iv 35. � I %/ io <br /> O N <br /> o F ._ o <br /> r 0 <br /> I z <br /> _riff 4 rJ .J 4 . <br /> _ _ <br /> • r <br /> 1 Side Setback area N 72°57'40" W <br /> 33' 33' I <br /> 1. I,the undersigned, hereby make application for a zoning permit only for the location and the work described herein and <br /> certify to the accuracy of that information. I further certify I am the property owner, or a duly authorized representative, <br /> and may sign this permit application on behalf of the owner(s)of said property, and I have read and understand all of <br /> the conditions of this permit and will construct the project in compliance with those conditions. I understand that failure <br /> to provide accurate information or to comply with any provisions of the permit renders it null and void and may result in an <br /> enforcement action. <br /> 2. I, the undersigned, hereby consent to the entry on the permitted premises by zoning inspectors of the Dane County <br /> Department of Planning&Development to determine compliance with the county's zoning ordinances.This consent is <br /> valid for the period commencing with issuance of this zoning permit and terminating with issuance of a certificate of <br /> compliance or until earlier revoked in writing by the owner of the property. <br /> PRINT: Owner/Agent DATE: <br /> \,,(..—N.' \vk -k---- ,—r.Ael l:4— <br /> SIGNATUR : Owner/•gent <br /> . 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.