|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-06347
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-06347
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 1:52:28 PM
Creation date
2/11/2016 1:46:10 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
06347
Town
Christiana Township
Section Numbers
14, 23
AccelaLink
DZPREZ-0000-06347
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Reclamation Plan CUP 1262 <br /> Reclamation in all four (4) areas shall be accomifished as <br /> the areas achieve sufficient size that areas are no longer <br /> needed for stockpiling or quarrying activities . fhis to <br /> occur never longer than one ( 1 ) year after extraction <br /> activity. <br /> All edge of quarry setbacks from roadways to bec ' :. at eighty <br /> ( 80 ) feet beyond (R. O.W. ) cut at no greater than ' 3 : 1 ) and <br /> to cover with no less than three ( 3 ) feet of soil . <br /> *Note that the present cover on nearly all of the indicated <br /> deposit will average three ( 3 ) feet in depth. The three ( 3 ) <br /> soil types which are present over this deposit c .'tribe <br /> depths to rock cap from twenty ( 20 ) to eighty ( [ � inches . <br /> Each extraction area will be handled separately in regards <br /> to configuration of the bottoms . Bottoms ( floors will each <br /> have a one ( 1 ) percent slope cut and graded to c : -er adequate <br /> surface water movement and shall go in all cases loped up <br /> toward Koshkonong Road with the bottom line to = .ersect the <br /> less than 30 degrees 3 : 1 cut slope from all road._ involved in <br /> the extraction site. The transmission line easements noted in <br /> print shall be protected to their maximum width .th cut <br /> back and cover to be set at a slope of no great(_ than 30 <br /> degrees ( 3 : 1 ) and covered (seeded ) with appropr; °e cover <br /> crops for harvest and livestock use. <br /> It is the intent of the owners that all slc 's <br /> will be at no greater than 22 . 5 degrees to - ,duce <br /> problems in the future for crop production . <br /> Surface water runoff shall be as notes for area II and <br /> III in the north portion of area II with the us(_ )f three <br /> ( 3 ) acre detention areas . The elevations shown lustrate <br /> an easy and logical location (s ) for the three ( ' ) north <br /> areas . As extraction occurs , it will become ea: ,r to <br /> control surface runoff than is currently occurr <br /> naturally. Waterways ( 13 ' bottoms ) shall be co' rutted as <br /> needed . The south area ( IV) slopes mostly nort'. .s noted . <br /> However , the extraction would start on the sout_ lope and <br /> will need not be addressed except as shown with three <br /> ( 3 ) acre detention acre south of the deposit an !own slope <br /> to a presently used grassed runoff area . <br /> Ground water <br /> The visual description of this deposit will held <br /> illustrate part of the ground water pollution p ; �tial . <br /> The elevation (USGS ) show 950 ' as the top and 8 <br /> at the spillway of the Rockdale dam (USGS bench-la k ) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.