Laserfiche WebLink
P w <br /> State of Wisconsin \ DEPARTMENT OF NATURAL RESOURCES <br /> WO RI <br /> WISCONSIN 101 South Webster Street <br /> 7921 <br /> DEPT. OF NATURAL RESOURCES Box <br /> Madison, Wisconsin 53707 3707 <br /> George E.Meyer <br /> Secretary <br /> September 20, 1994 <br /> Roxanne Seeliger <br /> Deconstruction, Inc. <br /> 1201 Bultman Road <br /> Madison, WI 53704 <br /> SUBJECT: Waste Reduction and Recycling Demonstration Grant Program <br /> Application #95-1 1 <br /> Dear Ms. Seeliger: <br /> The Department of Natural Resources has completed an initial review of your application <br /> for a Waste Reduction and Recycling Demonstration Grant. At this time, we need <br /> additional information or clarification on specific portions of your grant application. The <br /> following required information is broken out into specific categories: <br /> Project Workplan <br /> • How will exempt waste (clean soil, brick, building stone, concrete, reinforced <br /> concrete, broken pavement, and unpainted or untreated wood) be separated from <br /> other materials? The application seems to state that separation will not happen until <br /> after the shredder, when it is impossible to separate. <br /> • If only exempt waste is processed for the land reclamation material, then testing for <br /> chemical/environmental reasons is not necessary. If non-exempt waste (eg. drywall, <br /> painted/treated wood,...) is processed with the exempt material, then extensive <br /> testing is necessary. Based on the floor sketch, there could be a major problem with <br /> non-exempt material being shredded for clean fill. Please provide information on the <br /> type of waste to be processed and testing procedures if necessary. <br /> • Where and how is woodwaste to be stockpiled? Does this include painted and/or <br /> treated wood which is not considered an exempt waste? What will happen to <br /> woodwaste if no market is found? <br /> • Do you have zoning permits for operating the facility? If so please provide copies. <br /> Project Budget <br /> • The addendum has been received and the proposed budget has been revised to <br /> incorporate the changes submitted by the applicant since these changes did not <br /> result in an increase to the grant amount. <br /> !K� <br /> R 7dd <br />