|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-06172
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-06172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 2:59:24 PM
Creation date
2/19/2016 2:59:18 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
06172
Town
Cottage Grove Township
Section Numbers
34
AccelaLink
DCPREZ-0000-06172
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br /> DANE COUNTY <br /> CONDITIONAL USE PERMIT #1218 <br /> THE ZONING AND NATURAL RESOURCES COMMITTEE OF THE DANE COUNTY <br /> BOARD PURSUANT TO SECTION 10.255 (2) OF THE DANE COUNTY CODE OF <br /> ORDINANCES DOES HEREBY: <br /> GRANT: Conditional Use Permit subject to conditions . <br /> FOR: Mineral extraction site expansion. <br /> EFFECTIVE DATE OF PERMIT: May 13, 2003 EXPIRATION DATE: June 6, <br /> 2004 <br /> THE CONDITIONAL USE SHALL BE LOCATED ON THE PROPERTY DESCRIBED AS <br /> FOLLOWS: <br /> Part of the E 1/2 NE 1/4 and W 1/2 NW 1/4 Section 34, Town of <br /> Cottage Grove described as follows: Commencing at the Northwest <br /> corner of NE 1/4 of said Section thence South 773 . 94 feet to the <br /> point Of beginning; thence West 670 feet; thence South 950 feet; <br /> the East 1345 feet; thence North 400 feet; thence West 675 feet; <br /> thence North 550 feet to the point of beginning. <br /> CONDITIONS <br /> These conditions are specifically made applicable to this permit, <br /> any violation of such conditons shall be sufficient grounds for <br /> revocation of this permit. <br /> �F{� he applicant shall submit an erosion control plan <br /> ok�°^ � covering the entire CUP area for the duration of <br /> Ski operations, and receive approval of an erosion control <br /> permit prior to commencing extraction operations . <br /> 2 . The applicant shall apply for and receive all other <br /> required local, state and federal permits . <br /> 3 . Operations shall cease no later than 2005 (10 years <br /> from date of Town approval which was 06/06/94] . <br /> 4 . Reclamation shall meet requirements of Chapter 74, Dane <br /> P`7 taz v`? County Code of Ordinances . <br /> 5 . he driveway accessing the subject site shall be paved. <br /> At a minimum, the driveway should be paved for a <br /> � distance of at least 100 feet from the public road. <br /> All other driveways not paved should be graveled. The <br />
The URL can be used to link to this page
Your browser does not support the video tag.