|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00023
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 11:10:54 AM
Creation date
2/22/2016 1:09:19 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7. Grading must be confined to the areas shown on the plan. No material storage, vehicle <br /> traffic or grading may occur outside the limits of disturbance identified on the plan. In <br /> the event any other areas are disturbed, additional erosion control measures, fees, and <br /> plan revisions will be required. <br /> 8. In the event that additional impervious areas are added that are not shown on the plan, <br /> a survey may be required to document cumulative impervious on the site. Greater than <br /> 20,000 sq.ft. cumulative impervious areas placed on the site after 8/22/01 will trigger an <br /> after-the-fact stormwater management permit. <br /> 9. The plan includes a phased construction schedule as follows: <br /> Disturbed areas associated with driveway: <br /> Construction of the driveway is scheduled to begin on February 8, 2016. <br /> The driveway sideslopes will be permanently restored, as noted in the plan, by <br /> April 5, 2016. <br /> Disturbed areas associated with buildings: <br /> Disturbed areas under 3:1 associated with the buildings are scheduled to be <br /> disturbed on February 8, 2016, and must be permanently restored, as noted in <br /> the plan, by September 15, 2016. <br /> Disturbed areas over 3:1 associated with the buildings are scheduled for grading <br /> on August 18, 2016. These areas must be heavily mulched with hay or straw and <br /> provided 70%coverage by August 22, 2016, until they are permanently restored, <br /> as noted in the plan, by September 15, 2016. <br /> The construction site must follow the plan according to the schedule approved by Dane County <br /> Water Resource Engineering. This permit will expire on the stabilization date included in the <br /> plan (September 15, 2016) and may be amended prior to permit expiration only. This review <br /> is for the erosion control requirements of Chapter 14, Dane County Code of Ordinances only <br /> and other approvals may be necessary. A permit card must be obtained from Water Resource <br /> Engineering and displayed onsite prior to disturbing ground. <br /> Cc: Aaron Falkosky, Quam Engineering, LLC (email) <br /> Eric Rortvedt, P.E., Wisconsin Department of Natural Resources (email) <br />
The URL can be used to link to this page
Your browser does not support the video tag.