|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPZP-2016-00023
DaneCounty-Planning
>
Zoning
>
1 Permits
>
2010s
>
2016
>
DCPZP-2016-00023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 11:10:54 AM
Creation date
2/22/2016 1:09:19 PM
Metadata
Fields
Template:
Zoning Permits
AccelaLink
DCPZP-2016-00023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> 335 N. Nine Mound Road, Verona, WI 53593-1035 <br /> 845-7187, Fax 845-7143 www.town.verona.wi.us <br /> own <br /> of DRIVEWAY Construction Permit Lot 4 — CSM 14036 - Black Cherry Court <br /> erona <br /> Town of Verona <br /> Jan 5, 2016 <br /> Applicant/Agent: Temple Builders/Justin Temple <br /> Property Owner: Mark Codde&Janna Rose <br /> Mailing Address for Completed Permits Name: Temple Builders/Justin Temple <br /> Address: 2501 W. Beltline Hwy, Ste 113 <br /> Parcel# 062-0608-353-8640-0 Madison, WI 53713 <br /> Town Road: Black Cherry Court Permitted Use: Single family residential driveway <br /> Town Project Manager Determination: Date: 08-21-15 <br /> Prepared by: Ron Lease Phone: 338-3626 <br /> Determination: <br /> • Approved Copy of Dane Co. Erosion Control plan, required prior to issuance of driveway <br /> permit. <br /> • No 18" culvert needed. <br /> • Approx. 50 ft. 3" clear tracking mat from property line over required. <br /> • Driveway exceeds 500 ft. A passing lane is required for emergency vehicles. It should be <br /> located approximately <br /> • 300 ft. up which is at the half way point. <br /> • 50 ft. hammerhead required at the house turnaround, 100 ft. back from the house. This shall <br /> include a 27 ft. radius. <br /> • Approval is contingent on final approval by the Verona Fire Department. <br /> • Drive will be no less than 12' wide with one foot of stone made up of 6" of 3" breaker run and 6" <br /> of base course. <br /> • Restoration of the road right of way access and driveway construction area shall include <br /> topsoil, seed and mulch. <br /> • Restoration shall be completed prior to one year expiration date— September 1, 2016. <br /> Verona Fire Department Date: 09-01-15 <br /> Prepared by: Matthew Miller <br /> Determination: Approved <br />
The URL can be used to link to this page
Your browser does not support the video tag.