Laserfiche WebLink
rG_ <br /> 44', ZNR 11/26/91 Minutes <br /> page 4 <br /> • <br /> 3. There shall be a gradual feathered slope in all detention basins and <br /> ponds. No vertical walls. <br /> 4. In regards to dust, the Town Chairperson, if after physically viewing <br /> the site, deems that dust is causing a problem, will have the right to <br /> shut the job down until control measures correcting the <br /> g problem can be <br /> , implemented. <br /> 5. Approximately ten acres of land will be opened up for clay extraction <br /> at one time. When the excavation is complete on the first ten acres, <br /> the next ten acres will be stripped of topsoil. That topsoil will then <br /> be placed on the first ten acres stripped. This procedure will then be <br /> repeated for the following acres. After the topsoil is replaced, it <br /> Pwill be graded and seeded. <br /> ! 6. Soil erosion control will be required and enforced. Siltation fences <br /> F shall be constructed as required. <br /> f <br /> 7. Hours of operation shall be 6:30 am to 5:30 pm. Truck hauling shall be <br /> limited to 7:00 am to 4:00 pm. The intent is that work days shall be <br /> f <br /> !' ; Monday through Friday with the exception of an occassional Saturday for <br /> i rain make-up. <br /> i;/ cl‘ —,'/ 8.A good faith effort shall be made to leave several inches of clay on <br /> ,/ // site.' Surface of topsoil will be prepared prior to seeding such that <br /> l� roots could be established. <br /> Vi "H 4:/The land shall be kept in grassland/hay production for an initial five <br /> i year period to allow soil structure to become re-established, and to <br /> I assure no harmful effects to area groundwater. <br /> 10. After this intitial period, the reintroduction of a more intense land <br /> use such as row-crop agriculture may be allowed based on soil test <br /> E: results and committee approval. <br /> 11. The Town of Verona Board will be notified of any requested changes in <br /> I land use. <br /> j <br /> 12. Soil testing shall include remapping based on soil borings. In <br /> li addition, test plots shall be done to determine yields on the rebuilt <br /> soil so future nitrogen can be closely tied to yield expectations. <br /> 13. Groundwater monitoring wells may also be required. <br /> 14. Land use must follow State standards for nutrients and pesticides <br /> currently being set by the UW, State and Federal agencies. <br /> l CONDITIONAL USE PERMIT ##956 by Dale A. Ganske, agent for Mark & Mary <br /> Olson to allow 196 foot radio tower on property located at 6839 Portage Road <br /> in part of the NW 1/4 NW 1/4 Section 27, Town of Windsor. <br /> :g . <br />