|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01225
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01225
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 9:30:49 AM
Creation date
2/23/2016 9:30:47 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01225
Town
Verona Township
Section Numbers
11
AccelaLink
DCPCUP-0000-01225
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> " `' County of Dane <br /> ''`�• '; Department of Public Works, ", se' 115 West Doty Street Room 2144 <br /> Madison, Wisconsin <br /> 53703-3202 <br /> KENNETH J. KOSCIK, P.E. AL CZECHOLINSKI <br /> Public Works Director <br /> 608-266-4018 Solid Waste Engineer/Hydrogeologist <br /> 608-266-4139 <br /> January 5, 1995 <br /> TO: Dane County Zoning <br /> Town of Verona Board <br /> Town of Verona Planning Commission <br /> RE: Conditional Use Permit for Clay Soil Extraction <br /> Dear Sir/Madame: <br /> Dane County Public Works Department is hereby applying for a Conditional Use <br /> Permit for the following parcel located in the Town of Verona: <br /> The SE 1/4 of the SE 1/4 Section 11, T6N, R8E. <br /> Dane County Public Works has been removing clay soils from the above property for <br /> use at Dane County Landfill Site No. 1 (Verona) to construct a new clay cap for the <br /> existing landfill. The 40 acre parcel that Dane County Public Works has purchased <br /> (see attached map) was approved for use as a borrow site by the Town of Verona and <br /> the Dane County Zoning and Natural Resources Committee during March 1994. <br /> Because one of the conditions specified by the existing CUP (#1123) for this clay <br /> borrow site required that project be completed during 1994, Dane County Public <br /> Works is requesting a new CUP that will allow the work to be completed during 1995. <br /> Work during 1994 at the Verona Landfill included reshaping and grading the entire 50- <br /> acre top surface of the landfill and placing clay, cover soil and topsoil on <br /> approximately 15-20 acres. Because all of the regrading work is now complete on the <br /> landfill top and the access road and sedimentation basin are already in place at the <br /> borrow area, progress in placing clay should proceed more rapidly during 1995. With <br /> good weather, completion of all excavation at the borrow site during 1995 will be a <br /> very realistic goal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.