|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-05896
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-05896
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 2:00:17 PM
Creation date
3/1/2016 2:00:14 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
05896
Town
Westport Township
Section Numbers
4
AccelaLink
DCPREZ-0000-05896
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br /> i 1 <br /> northern boundary of Capitol Estates, on the east by the proposed <br /> extension of Division Street, on the north by the northern boundary <br /> of Waunakee Heights extended westward, and on the west by a line <br /> parallel to and 180 feet west of Division Street extended, at a <br /> price satisfactory to Owners, but not greater than $10, 000 per <br /> acre, so that Owners and Developer can develop residential lots <br /> thereon and economically arrange for the extension of Division <br /> Street to access this purchased parcel and the northern portion of <br /> Waunakee Heights; or <br /> b. Extension of Division Street. To dedicate to <br /> the Village of Waunakee sufficient land along the westerly side of <br /> Division Street extended to permit the construction of an extension <br /> of that street at least to the northern boundary of Waunakee <br /> Heights, and to share in the costs of such construction pursuant to <br /> an appropriate special assessment formulra adopted by the Village. <br /> Operators shall use their best efforts to secure the agreement of <br /> Jerry Ripp to the provisions of this section. <br /> 3. AMENDMENT OF THE PERMIT APPLICATION. The Permit <br /> application shall be amended to cover the Ripp Expansion and the <br /> portion of Lots 32 and 33 of Waunakee Heights described below, and <br /> to include the following additional provisions and restrictions: <br /> a. Blasting. Blasting in the Endres Expansion, <br /> the southernmost 500 feet of the Ripp Expansion, and Lots 32 and 33 <br /> of Waunakee Heights shall be completed by August 1 , 1993 , and no <br /> further blasting in any of these areas shall be permitted after <br /> that date. <br /> b. Mining. Mining and excavation in the Endres <br /> Expansion shall be restricted to an area 200 feet south of the <br /> existing quarry, i. e. to the northernmost 200 feet of the Endres <br /> XExpansion. As provided below, Operators may also mine rock from <br /> the rear portion of Lots 32 and 33 of Waunakee Heights to the <br /> northeast of the berm to be constructed, as shown in Exhibit B. <br /> After August 1, 1993 , no mining or rock removal, except as <br /> necessary for and incidental to reclamation activities, may be <br /> conducted on Lots 32 and 33 of Waunakee Heights, the Endres <br /> Expansion, or on the southernmost 500 feet of the Ripp Expansion. <br /> c. Quarry Operations. No blasting, mining or <br /> excavation shall be permitted in any portion of the Endres or Ripp <br /> Expansions, or in any portion of the existing quarry, 30 months <br /> after the final plat for the development of Waunakee Heights, First <br /> Addition is approved by the Village Board of Waunakee; and during <br /> such time Operators shall not apply for extension of the existing <br /> quarry to any adjacent lands other than Endres and Ripp Expansions. <br /> No stone or rock crushing shall be permitted to be conducted on any <br /> portion of any of such sites 42 months after such final plat <br /> approval. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.