|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01133
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 2:01:25 PM
Creation date
3/1/2016 2:00:45 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01133
Town
Westport Township
Section Numbers
4
AccelaLink
DCPCUP-0000-01133
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
VLtll id MAL.LI VIIIIILLVVI\ 4-460-J4 1 17. 17 UUVLJI7444-' VVV V*J JULOIM <br /> (i) Mining and excavation in the <br /> Expansion Area shall be restricted <br /> to the Northern 200 feet of such <br /> area <br /> (ii) Rock may be moved from the <br /> Expansion Area in the area behind <br /> Lots 32 and 33 of the Plat of <br /> Waunakee Heights, First Addition, to <br /> the northeast of the berm previously <br /> constructed. <br /> (iii) After expiration of <br /> Conditional Use Permit (No. 1133) , <br /> no mining or other rock removal may <br /> occur behind said Lots 32 and 33 , or <br /> on the Expansion Area as shown on <br /> Exhibit A or on the southerly 500 <br /> feet of the Gravel Pit; except that <br /> Operator may continue to use its <br /> existing scale and driveways in this <br /> area. <br /> e. After expiration of Conditional Use Permit (No. <br /> 1133) , no mining or rock removal, except as may be <br /> necessary for or incidental to reclamation <br /> activities may be conducted upon the Expansion <br /> Area; and except that pending implementation of the <br /> reclamation plan, rock previously mined by the <br /> Operator may be stored on the expansion Area and <br /> moved to other locations. <br /> f. While quarry operations are conducted in the <br /> Expansion Area and until reclamation of the site is <br /> completed, the Operator shall take all reasonable <br /> precautions necessary in order to prevent personal <br /> injury and/or property damage from its activities <br /> occurring thereon. <br /> g. After expiration of Conditional Use Permit <br /> (No. 1133) , no _blasting, mining or excavation shall <br /> be permitted in any portion of the area marked as <br /> "Endres or Ripp Expansions" on Exhibit A attached <br /> hereto. On and after the date hereof, the Operator <br /> shall not apply for any extensions of existing <br /> quarry operations to the Endres or Ripp Expansions <br /> as shown on Exhibit A. <br /> h. The Operator shall prepare a plan of <br /> reclamation within ninety (90) days following the <br /> date of issuance of Conditional Use Permit (No. <br /> 1133 ) , which plan of reclamation shall be submitted <br /> 3 <br /> /19: <br />
The URL can be used to link to this page
Your browser does not support the video tag.