Laserfiche WebLink
I <br /> -, dam Universal Soil Loss Equation for Construction Si. <br /> l • Dane County Land Conservation Division <br /> f Ei'b_ � :7 <br /> 0,, 183 9 !.' <br /> Developer: Rosemarie Harbison <br /> Project: Harbison Creek Restoration Project <br /> Date: 12/15/2015 <br /> Soil Soil Slope <br /> Land Disturbing Period Annual R Map Erodibility K Slope Length LS Land Cover A=% <br /> Activity Begin Date End Date % R Factor Unit Factor (%) (feet) Factor C Factor (t <br /> disturb ground 1/7/2016 1/10/2016 0.0% 150 Ot 0.43 0.2% 1000 0.13 1.00 <br /> disturb ground 1/10/2016 1/24/2016 0.0% 150 Ot 0.43 0.2% 1900 0.14 1.00 <br /> disturb ground 1/24/2016 2/7/2016 0.4% 150 Ot 0.43 0.2% 2900 0.16 1.00 <br /> seed and mulch 2/7/2016 13.6% 150 Ot 0.43 0.2% 2900 0.16 0.12 <br /> TOTAL <br /> Land Disturbing Activities: input definition <br /> disturb ground activity which leaves the ground devoid of vegetation <br /> apply mulch application of straw mulch at 1.5 tons/acre <br /> seed and mulch seeding and application of straw mulch at 1.5 tons/acre <br /> seeding temporary or permanent seeding without the use of mulching materials <br /> sod installation of sod <br /> paving providing 100%cover to disturbed ground with paving materials or stone <br /> Desi nt <br /> Notes: 1)Distrub Ground-Access Road Date <br /> 2)Disturb Ground-channel/floodplain area Checke <br /> 3)Distub Ground-berm/pond Date <br />