|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-05937
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
DCPREZ-0000-05937
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2016 10:48:00 AM
Creation date
3/7/2016 10:43:20 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
05937
Town
Verona Township
Section Numbers
13
AccelaLink
DCPREZ-0000-05937
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DESCRIPTION <br /> o Use This potion of work is part of a Wetland Mitigation in conjunction with the <br /> Wisconsin Department of Transportation's Verona Bypass Project and in <br /> cooperation with the Wisconsin Department of Natural Resources. The <br /> area depicted above will provide a site for the excess material excavated <br /> from the: new Wetlands. <br /> o Legal The are:s. known as the Sharon L. Nesbitt property lies in the Southwest <br /> Quarter of the Northwest Quarter of Section 13, Township 6 North, Range <br /> 8 East Fax Key # 31 -0608-132-9000-5), the Southeast Quarter of the <br /> Northwest Quarter of Section 13, Township 6 North, Range 8 East (Tax Key <br /> # 31 -0,308-132-9500-0), and a portion of the Northeast Quarter of the <br /> Northw•-.st Quarter of Section 13, Township 6 North, Range 8 East (Tax Key <br /> # 31 -0508-132-8040-9). <br /> o Schedule comm•-xw.-,e 0,1 or ab:;u -(xm,-; 1, 1.;;24 doll ;4410,2 cotl 1piete(J :Jy <br /> Decemb.)r 31, 1994. <br /> o Method Silt fence for erosion control will be installed at those areas shown on the <br /> plan. Fisting topsoil in the areas of the proposed contours will be stripped <br /> and stockpiled. The excavated material from the new Wetlands will then be <br /> spread in this area. Upon completion, the salvaged topsoil will be replaced <br /> and all disturbed areas will be seeded in accordance with WisDOT specs. <br /> o Benefits By utilizing this proposal, no construction truck traffic would be required to <br /> travel on public roads. This translates into 30,000 dump trucks placing <br /> excessive wear on our roads, costs of which would be borne by the taxpayers, <br /> along with the potential for dirt and dust problems on the roads. <br /> Mann Bros., Inc. PO Box 48 Elkhorn, WI 53121 <br />
The URL can be used to link to this page
Your browser does not support the video tag.