Laserfiche WebLink
3/7/2016 <br /> SHELDON,ROD <br /> CLLARY' VeronaP O Box 930220,WI 53593 0220 Doc ID:8965020160307130956 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Proposal - Erected <br /> Roof Finish and Accessories for Building 1 <br /> Exterior Finishes <br /> Roof:Grand Rib 3 Plus <br /> -Lifetime Film Integrity Warranty,35 Year Fade and Chalk Warranty,and G-90 Galvanizing Up to 1.0 ounce of Zinc <br /> Protection. <br /> Ventilation <br /> Roof <br /> Ridge Vent(s): <br /> 10' cont.ridge vent with 2.5"throat <br /> Distance from end wall 1 overhang to center.9' 3" <br /> 10' cont.ridge vent with 2.5"throat <br /> Distance from end wall 1 overhang to center.27' 9" <br /> Accessories <br /> Roof <br /> Condensation Control for Building 1:None <br /> Ceiling for Building 1 <br /> Ceiling Insulation: No Fiberglass Batt Insulation Included <br /> Elevations for Building 1 <br /> East Side Wall 1 on Building 1 <br /> Note:These colors are as close to the actual colors as permitted by printing.Actual metal samples must be reviewed with your Sales <br /> Specialist.Colors vary depending upon position and angles. <br /> Exterior Finishes <br /> Side Wall 1 on Building 1 <br /> Siding:Grand Rib 3 Plus <br /> 2/0 built with pride before the &II is applied 8 4 of 14 <br /> e <br />