Laserfiche WebLink
3112016 <br /> C ARY P.0 Box 930220 SHELDON,ROD <br /> Verona,WI 53593-0220 Doc ID:8965020160307130956 <br /> BUILDING CORP. Phone:(608)845-9700 <br /> ClearyBuilding.com Fax:(608)845-7070 Cleary/Owner Project Proposal - Erected <br /> Cleary Slide Door Slide Door,Solid Panel. <br /> Slide:Left <br /> Opening Height:13'0" <br /> Width:16'0" <br /> Standard(see drawing) <br /> Distance from left edge of wall to left edge:22'0" <br /> Distance from 100'+0" mark to bottom of door plus:2" <br /> Note: Finished floor elevation will reduce slide door height opening. <br /> Interior Finishes/Insulation <br /> End Wall 2 on Building 1 <br /> Condensation Control:None <br /> Insulation:None <br /> Custom Priced Items for Building 1 <br /> Name Notes <br /> labor to remove endwall steel, labor to remove endwall steel,columns,girts,slide door/prep for addition <br /> columns,girts,slide door/prep for <br /> addition <br /> replace 162' of existing 3'eavelite replace 162'of existing 3' eavelite <br /> Manually Priced Items for Building 1 <br /> Square Foot(SF)and Lineal Foot(LF)are approximate and may be adjusted based upon final building specifications. <br /> Code Name Quantity Unit <br /> 52.1 14' Eave Height-Convert from 2"x 4"Corner Bracing to 2"x 6" 1 Bldg <br /> Corner Bracing* <br /> 66.1 Vertical Steel Grand Rib III+ * 198 SF <br /> 51.2 Add 4'to column length(2"x 6"column)* 18 Each <br /> C-110 built with pride before the orik is applied ® 8 of 14 <br />