Laserfiche WebLink
It M. <br /> CONDITIONAL USE PERMIT #1159 Page 2 <br /> CONDITIONS <br /> HOURS OF OPERATION: <br /> 1. Operations, excluding blasting, may begin at 6:00 a.m. Monday - Saturday. <br /> 2. Blasting may begin at 7:00 a.m. Monday - Saturday. <br /> 3. Drilling, blasting and crushing shall cease at 7:00 p.m. Monday - Friday <br /> and at 12:00 noon on Saturday. <br /> AREA: The North line of the conditional use permit area shall be in-line with <br /> the South right-of-way line of Sandy Lee Lane. <br /> BLASTING: Blasting will be done in accordance with the applicable <br /> restrictions contained in the Wisconsin Administrative Code regulations. When <br /> blasting, seismographic readings will he maintained below 0.40 in./sec. The <br /> seismograph will be located at various positions around the perimeter of the <br /> quarry property. This level is 20% below the ceiling allowed by the Wisconsin <br /> Administrative Code for blasting activities. When blasting is to be done, the <br /> neighbors will be notified in writing no less than eighteen hours in advance <br /> of the proposed blasting operation. Madison Crushing will notify those <br /> neighbors who which to be notified on Felland Road, from 5152 Felland Road to <br /> Burke Road, on Burke Road from Felland Road to Reiner Road, on Reiner Road <br /> from Burke Road to 5107 Reiner Road and all homes on Sandy Lee Lane. <br /> Seismograph records will be filed with the Town within seven (7) working days. <br /> BERMS: Berm along Reiner Road is to be no less than seven feet high from the <br /> Reiner Road center line elevation with 3 to 1 slope on Reiner Road side. The <br /> berm to be constructed 40 feet from the center line of Reiner Road. This berm <br /> is to be completed in the Spring of 1990 on the permitted area along Reiner <br /> Road. Madison Crushing will also assist the Town of Burke to clean up the <br /> ditch line the full length of the quarry operation. (The existing trees will <br /> be left for dust control until the new planting have grown) . A seeded berm <br /> will be built westerly along the North line of the subject area not less than <br /> four feet in height, as stripping material becomes available, but not later <br /> than the Fall of 1990. <br /> except the Westerly 900 ' , more or less, of the South property line, <br /> FENCING: The entire quarryflwill be enclosed by a woven wire fence located one <br /> foot inside the property line and a locked gate at the North entrance. The <br /> fence along Reiner Road and the North line of the C.U.P. will be installed in <br /> the Spring of 1990, the entire quarry will be fenced by the Fall of 1990. <br /> THE ENTRANCE ROAD- <br /> The entrance road down into the quarry will be oiled with emulsified road oil <br /> to control dust at all times. <br /> RECLAMATION: When the quarry has been depleted, or within twelve (12) months <br /> of the expiration of the Conditional Use Permit, which ever comes first, <br /> Madison Crushing will slope the banks to not steeper than a one to one slope, <br /> and will cover the flat areas with at least one foot of tillable soil. <br /> Applicant shall comply with all municipal, state and federal laws and <br /> regulations pertaining to reclamation procedures and air and noise pollution <br /> measured at the perimeter of the mineral extraction operation during the term <br /> of this permit. <br />