|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01169
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
CUPS 00001-02383
>
DCPCUP-0000-01169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2016 1:47:24 PM
Creation date
3/16/2016 12:44:02 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01169
Town
Westport Township
Section Numbers
32
AccelaLink
DCPCUP-0000-01169
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
COMPOSITE REPORT - Page 2 APPLICATION NO. CGC/'//4 l <br /> • <br /> STAFF COMMENTS <br /> REGIONAL PLANNING <br /> CUP 1169. The St. Benedict Center has been a religious use of this property for many years. <br /> There is no apparent expansion proposed,just remodeling of existing facilities. <br /> We note that there have been conferences of non-religious groups held at the center. If the intent <br /> is to continue or increase this rental-type activity, it will probably require rezoning rather than a <br /> conditional use permit. <br /> Since the request appears to be for remodeling existing buildings, the conditional use permit <br /> should allow for religious use of existing buildings. <br /> ENVIRONMENTAL HEALTH (septic, etc.1 <br /> DANE COUNTY HIGHWAY <br /> CTH "M" is controlled access. Provided this expansion will not result in an increased use of the <br /> current access, we have no objections. <br /> OTHER <br />
The URL can be used to link to this page
Your browser does not support the video tag.