<br /> 625.4.1
<br /> limits of construction designated on the plans or in the contract or as directed by the
<br /> engineer.
<br /> 1 .
<br /> When measured by the cubic yard,the material will be measured in the vehicle;or in
<br /> the event the material is transported in vehicles not adapted to such measurement, the
<br /> material will be measured in cubic yards of volume in its original position computed by
<br /> the method of average end areas with no correction for curvature;or by the method of
<br /> truncated prisms,if the engineer so elects.The quantity to be paid for shall be the actual
<br /> number of cubic yards furnished and placed in accordance with the requirements of the
<br /> contract.
<br /> 625.4.2 Salvaged Topsoil.Salvaged Topsoil will be measured by the square yard,and
<br /> the quantity measured for payment under this item shall be the actual number of square
<br /> yards of area topsoiled to the depth specified within the-limits of construction designated
<br /> on the plans or m the contract or.:s directed by the engin;.'er.
<br /> 625.5 Bails of °aymcnt.
<br /> 625.5.1 Topsoil.Topsoil,measured as provided above,will be paid for at the contract
<br /> unit price per square yard or per cubic yard for Tcanoil,which price shall be full compen
<br /> sation for furnishing,excavating, loading, hauling and placing of this material; for:in-
<br /> .
<br /> dercutting of excavations or under-fining of embankments necessary to receive this meet
<br /> fiat;and for furnishing all labor,material:,equipment,tools and incidentals necessary tO
<br /> - tli r :,
<br /> Dorf,tit, -,. .
<br /> 625.5.2 Salvaged Topsoil.Salvaged To :oil,measured as provided above,will be pa f;
<br /> for at the contract unit prime per ..i uarc yarn for Salvaged Topsoil,which price shall -1
<br /> full compensation for removing, f: .ckpiiirg. rEilaiming,hauling and placing this ma
<br /> vial;and fm furnishing all labor,equipment, toots and incidentals necessary to complet
<br /> the work, provided, however, that no deductions will be made from items of Roadvq'',f
<br /> and Drainage Excavation for the quan;it cs of Salvage.; Topsoil material which may aii
<br /> obtained from areas of cut seetio s, not will t e volumes of Salvaged Topsoil remov-4.1
<br /> from sites of proposed embankments be measured fen payment or paid for under RoB�t.
<br /> way and Drainage Excavation items,nor will any allowance,adjustment or rneasurerii.1t
<br /> for payment under the pertinent ExcavatIon nniao be made for undercutting of cut -,,
<br /> lions or underfilling of embankments as hereinbcforc prescribed under Preparatiop
<br /> i dway for topsoiling.
<br /> . Areas of salvaged topsoil washed out or damaged due t o erosion after partial ,•---,
<br /> II lance of the salvage topsoil and all associated.erosion control work shall be restored.„.
<br /> the contractor.The restoration of such areas will be paid for at a unit price determined
<br /> multiplying the contract unit price bid for Salvaged Topsoil by three-
<br /> SECTION 626, PEAl' HUMUS
<br /> i
<br /> 626,1 Description. This work shall consist of life selection of those portions 0
<br /> material obtained under the item of Marsh Exc_a\'ation under the contract,or as
<br /> l
<br /> have been stored under a previous contract,and the incorporation thereof with th4 ''
<br /> .', faces of such portions of the roadway as shown on the plans,required in the con .
<br /> ,, directed by the engineer. Plik.
<br /> 626.2 Materials.
<br /> 626,2.1 When Marsh Excavation Is an Item in the Contract.The contractor slut, ,,
<br /> front the material encountered under the item of Marsh Excavation those portio'
<br /> '0.:]
<br /> l i 462