Laserfiche WebLink
F a;' <br /> . . <br /> 625.4.1 <br /> limits of construction designated on the plans or in the contract or as directed by the <br /> engineer. <br /> 1 . <br /> When measured by the cubic yard,the material will be measured in the vehicle;or in <br /> the event the material is transported in vehicles not adapted to such measurement, the <br /> material will be measured in cubic yards of volume in its original position computed by <br /> the method of average end areas with no correction for curvature;or by the method of <br /> truncated prisms,if the engineer so elects.The quantity to be paid for shall be the actual <br /> number of cubic yards furnished and placed in accordance with the requirements of the <br /> contract. <br /> 625.4.2 Salvaged Topsoil.Salvaged Topsoil will be measured by the square yard,and <br /> the quantity measured for payment under this item shall be the actual number of square <br /> yards of area topsoiled to the depth specified within the-limits of construction designated <br /> on the plans or m the contract or.:s directed by the engin;.'er. <br /> 625.5 Bails of °aymcnt. <br /> 625.5.1 Topsoil.Topsoil,measured as provided above,will be paid for at the contract <br /> unit price per square yard or per cubic yard for Tcanoil,which price shall be full compen <br /> sation for furnishing,excavating, loading, hauling and placing of this material; for:in- <br /> . <br /> dercutting of excavations or under-fining of embankments necessary to receive this meet <br /> fiat;and for furnishing all labor,material:,equipment,tools and incidentals necessary tO <br /> - tli r :, <br /> Dorf,tit, -,. . <br /> 625.5.2 Salvaged Topsoil.Salvaged To :oil,measured as provided above,will be pa f; <br /> for at the contract unit prime per ..i uarc yarn for Salvaged Topsoil,which price shall -1 <br /> full compensation for removing, f: .ckpiiirg. rEilaiming,hauling and placing this ma <br /> vial;and fm furnishing all labor,equipment, toots and incidentals necessary to complet <br /> the work, provided, however, that no deductions will be made from items of Roadvq'',f <br /> and Drainage Excavation for the quan;it cs of Salvage.; Topsoil material which may aii <br /> obtained from areas of cut seetio s, not will t e volumes of Salvaged Topsoil remov-4.1 <br /> from sites of proposed embankments be measured fen payment or paid for under RoB�t. <br /> way and Drainage Excavation items,nor will any allowance,adjustment or rneasurerii.1t <br /> for payment under the pertinent ExcavatIon nniao be made for undercutting of cut -,, <br /> lions or underfilling of embankments as hereinbcforc prescribed under Preparatiop <br /> i dway for topsoiling. <br /> . Areas of salvaged topsoil washed out or damaged due t o erosion after partial ,•---, <br /> II lance of the salvage topsoil and all associated.erosion control work shall be restored.„. <br /> the contractor.The restoration of such areas will be paid for at a unit price determined <br /> multiplying the contract unit price bid for Salvaged Topsoil by three- <br /> SECTION 626, PEAl' HUMUS <br /> i <br /> 626,1 Description. This work shall consist of life selection of those portions 0 <br /> material obtained under the item of Marsh Exc_a\'ation under the contract,or as <br /> l <br /> have been stored under a previous contract,and the incorporation thereof with th4 '' <br /> .', faces of such portions of the roadway as shown on the plans,required in the con . <br /> ,, directed by the engineer. Plik. <br /> 626.2 Materials. <br /> 626,2.1 When Marsh Excavation Is an Item in the Contract.The contractor slut, ,, <br /> front the material encountered under the item of Marsh Excavation those portio' <br /> '0.:] <br /> l i 462 <br /> 1 <br /> ii <br />