Laserfiche WebLink
• P t2 — <br /> • • <br /> !e 630.1 j <br /> For convenience in checking the required rate of application, the materials used may , l • <br /> ?• be measured on a volumetric basis, providing the conversion from weight to volume is <br /> • <br /> determined from representative samples of the materials used. <br /> Agricultural limestone shall be incorporated in the soils in the designated areas in i <br /> conjunction with the required fertilizers, and the pertinent construction require <br /> ments applicable to fertilizers shall also apply to those materials. i <br /> 629.4 Method of Measurement. Fertilizer will be mcasurcd by the hundred pounds <br /> (cwt.)based on an application rate of seven pounds per 1000 square feet and 32 percent , <br /> required fertilizer components for Type A and 50 pe,r;cnt of such components for Type <br /> B. The quantity to be measured for payment shall be the amount of such material fur. I' <br /> • <br /> nished and incorporated in the work as ordered by the enginccr, all in accordance with <br /> the contract,except that fertilizer used for items of work specified under Furnishing and <br /> Planting Plant Materials will not be measured for payment but will be considere : ` <br /> d as a <br /> part of such items of work under the contract.The quantity to be measured for payment <br /> • shall be the number ofhundred-weight(cwt.)of material determined by multiplying the ' <br /> • actual number of cwt.of material incorporated by the ratio of the actual • <br /> fertilizer components used to 32 percent for Type A and to 50 percent for Type B. c of <br /> Agricultural Limestone Treatment will be measured by the ton(2000 lbs,)based on ' <br /> an application rate of 100 pounds square <br /> • <br /> quantity to be measured forr payment shat ll b the number of an <br /> ons of material determined 60-69. 1 <br /> by multiplying the actual number of torts of ma tend'incorporated by 100 and dividing by <br /> the application rate required for the index zone of the material used, <br /> 1 <br /> 629.5 Basis of Payment.Fertilizer,measured as provided above,will be paid for at the <br /> contract unit price per hundred-weight(cwt.)for Fertiliser,Type A,or Fertilizer,Type B, f i <br /> which price shall be full compensation for furnishing,hauling,placing and incorporating I <br /> in the work;and for all labor, materials,equipment, tools and incidentals necessary to i , <br /> complete the work. r <br /> Agricultural Limestone Treatment,measured as provided above, will be paid for at : i <br /> the contract unit price per ton for said item,which price shall <br /> furnishing,hauling,placing and incorporating the required materialsli nothe and for Ij ± <br /> all labor,equipment, tools and incidentals necessary to complete the work. I; <br /> i ' <br /> SECTION 630. SEEDING <br /> 6311.1 Description.This work shall consist of prcpanng seed beds and furnishing and 'I <br /> sowing the required seed on slopes,appurtenances and other areas,and on borrow pits <br /> and waste disposal areas, as shown on the plans or i <br /> p it" <br /> 'directed to be seeded by the engineer, all in accordance the requirements ofrthe i <br /> hpccillcations_ <br /> I, <br /> Seeding, Wetlands shall consist of the furnishing and sowing of Seed Mixture No.60 Il <br /> on areas of the right-of--way and casements which may be wet for extended periods of <br /> time as shown on the plans,designated in the contract or directed by the enginccr.eding,Uplands shall consist of the furnishing <br /> on slopes, and sowing of'Seed Mixture No 70 'i <br /> Ix appurtenances and other upland areas of the right-of-way having well-drained <br /> 't oils where dry,draughty conditions arc likely to exist as shown on the plans,designated <br /> in the contract or directed by the engineer. <br /> Seeding,Temporary shall consist of the furnishing and sowing of a temporary seed I. <br /> Mixture on the slopes and appurtenances of temporary embankments and roadways as <br /> shown on the plans, designated in the contract or directed by the engineer. <br /> 475 I <br /> t <br /> -rte <br />