Laserfiche WebLink
March 4, 2015 <br /> RECEIVED <br /> Dane County Planning and Zoning <br /> Attn: Hans Hilbert <br /> 210 Martin Luther King Jr Blvd <br /> Madison,WI 53703 MAR 1 1 2016 <br /> Re: Project I.D. 5848-00-00 <br /> CTH PB—STH 69 <br /> (Sugar River Bridge B-13-0685) DANE COUNTY PLANNING&DEVELOPMENT <br /> CTH A <br /> Dane County <br /> Dear Hans, <br /> Dane County is proposing to replace the existing bridge on CTH A over the Sugar River. We have <br /> received approval of the preliminary structure plans. CTH A will be closed to traffic during the <br /> construction period. Enclosed are a project location map, the road plan/profile sheets, and the structure <br /> general plan sheet. <br /> The proposed project will reconstruct a 0.11-mile section of CTH A, currently classified as a C2 rural <br /> collector. The existing facility has an 11 foot asphalt travel lane in each direction and 2 to 5 foot base <br /> aggregate shoulders. The existing structure, B-13-0035, is a three span steel girder concrete deck bridge. <br /> It has a clear roadway width of 26 feet and a total length of 160.0 feet. The existing right-of-way is 60.0 <br /> feet south of the centerline, 65.0 feet north of the centerline. Land use within the project area is primarily <br /> agricultural. The proposed project will reconstruct CTH A to provide 11-foot wide paved travel lanes, 5- <br /> foot paved bike lanes, and 1-foot wide base aggregate shoulders. The project will replace the existing <br /> bridge with a two span 36-inch prestressed concrete girder bridge. The structure overall length will be <br /> 159.75 feet. New right-of-way acquisition and temporary easements are not anticipated. <br /> The replacement structure design Highwater100 will not be changed from the existing structure with an <br /> elevation of 878.26. The proposed elevation of the centerline of the road at the center of the bridge is <br /> approximately 887.68. <br /> This project is scheduled for a March 14, 2017 bid date by WisDOT with construction anticipated to start <br /> summer 2017. Thank you for your time and consideration. <br /> Sincerely, <br /> MSA Professional <br /> w feessiona�l Services, Inc. <br /> /1/( <br /> Chad Wagner <br /> Project Engineer <br /> CWasner `r ,50. — p5 . Cyr, <br /> CDW <br /> Enc. cc S X11)--- G6S l <br /> cc: Matt Rice, Dane County Highway Engineer <br /> Mike Banaszak,Local Program Management, KL Engineering <br /> Mike Statz,MSA Professional Services, Inc. <br /> \\manas2\projects\11300s\11330s\11331\11331012\Correspondence\Zoning\11331012 zoning.doc <br />