Laserfiche WebLink
COMPOSIT REPORT <br /> APPLICATION # �& /083 <br /> TOWN BOARD COMMENT: <br /> STAFF COMMENTS <br /> REGIONAL PLANNING COMMISSION (RPC). <br /> CUP 1083. This is an active mineral extraction site. The site was approved in June 1993 to a hot-mix <br /> batch plant, specifically for the State Highway 19 project. <br /> Now the request is for a concrete batch plant site on a more or less permanent basis. <br /> During the review and public hearing on the hot-mix batch plant, a number of issues were raised: <br /> - There are a number of homes in the area. (Many of the residents opposed the hot-mix plant.) <br /> - Groundwater concerns were expressed. <br /> - Dust control was a concern. <br /> - Additional truck traffic and turning movements on Hwy. 12 were a concern. <br /> While there may not be the level of groundwater concerns with the concrete batch plant as there is with the <br /> hot-mix plant, the other concerns appear to be equally valid. In fact, the additional truck traffic could be <br /> compounded if the concrete plant is operating at the same time as the hot-mix plant. <br /> If the action is to approve this for a concrete batch plant site, there needs to be some coordination of <br /> conditions and truck travel times. <br /> ENVIRONMENTAL HEALTH DEPT. (EHD) <br /> CO. HIGHWAY DEPT. <br /> OTHER <br />