|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01083
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-01083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2016 9:24:37 AM
Creation date
3/28/2016 9:24:28 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01083
Town
Springfield Township
Section Numbers
35
AccelaLink
DCPCUP-0000-01083
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PETITION <br /> TO: PLANNING COMMISSION, TOWNSHIP OF SPRINGFIELD <br /> THE TOWN OF SPRINGFIELD <br /> THE DANE COUNTY ZONING COMMITTEE <br /> WISCONSIN DEPARTMENT OF NATURAL RESOURCES <br /> c.U.P. 11083 <br /> FOR: YAHARA MATERIALS. INC. <br /> PROPOSED USE: CONSTRUCTION OF A CONCRETE BATCH PLANT AT SUBJECT LOCATION <br /> LOCATION: West of 4986 and 5018 USII 12, Section 35, E 1/2 NW, Town of Springfield. Area: 26 <br /> more or less acres <br /> We the undersigned arc in opposition to the CUP 1083 because we believe that this expanded <br /> use: <br /> I) will be substantially detrimental to or endanger our public health. safety and general <br /> welfare in this area due to potential for air and water pollution as well as clearly documented <br /> increased traffic hazard. <br /> 2) foresccably can substantially impair or diminish the common enjoyment and <br /> property value of other prior established permitted uses of property In the neighborhood <br /> 3) will negatively impact future and current development of neighboring property <br /> consistent with its pre e x is t I a g residential and farm use <br /> We the undersigned also believe that prior to consideration of any new use of the extraction <br /> site by Yahara constrructiou as proposed In this CUP the following issues must be addressed: <br /> 1) the term of the CUP must be time-limited so that it can be reevaluated on a periodic <br /> basis not to exceed 1 year to recognize the rapid change in needs of the county and the <br /> community <br /> 2) the daily hours of operation must be addressed in any CUP <br /> 3) an environmental analysis or impact statement considering both the increased traffic <br /> hazards and water pollution and use hazards inherent in the proposed expanded use <br /> 4) the currently documented concerns of the surrounding landowners concerning <br /> property damage and impaired land use caused by blasting, crushing, and trucking as well as <br /> the apparent lack of accountability as demonstrated by Yahara Materials previous responses to <br /> residents' concerns which would be increased with an expanded use <br /> 5) 15 year environmental bonding for at least 10 million dollars to cover potential <br /> damage to the farming and residential water supply and/or to neighboring property value and <br /> structures to be reimbursed to current property owners <br /> G) IS year bonding for at least l.5 ruillion dollars payable to the Town of Springfield for <br /> 1 1 potential lost property tax revenue duo to decreased property value. <br /> NAME STREET ADDRESS CITY <br /> \IV X6Skr <br /> 0.#1r <br /> 5`� <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.