|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPCUP-0000-01083
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPCUP-0000-01083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2016 9:24:37 AM
Creation date
3/28/2016 9:24:28 AM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
CUP
Petition Number
01083
Town
Springfield Township
Section Numbers
35
AccelaLink
DCPCUP-0000-01083
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4 <br /> YAHARA MATERIALS, INC. <br /> 6117 C.T.H. "K"/ROUTE 1 <br /> WAUNAKEE, WISCONSIN 53597 <br /> PHONE 608-849-4162—FAX 849-5062 <br /> AN EQUAL OPPORTUNITY EMPLOYER <br /> May 25, 1993 <br /> Dane County Land Regulation & Records <br /> Room 116, City-County Building <br /> Madison, WI 53709 <br /> TO WHOM IT MAY CONCERN: <br /> Yahara Materials, Inc. , 6117 CTH "K", Waunakee, WI 53597 is requesting a <br /> zoning change from A-1 Exclusive to A-Sand a Conditional Use Permit for <br /> the erection and operation of a portable ready mix batch plant. <br /> The location of this plant would be at our existing quarry located in <br /> the NE} - SEI -NWi, Sec.36, T8N-R8E-Springfield Township, Dane County, WI. <br /> The Batch plant would be used to furnish concrete for local use and construction <br /> sites. This would be on a continuing basis for a as needed situation according <br /> to projects being done in the area. <br /> By using a portable batch plant, the plant can be moved to the proximity <br /> of the jobs. This puts the plant at the aggregate source which eliminates <br /> the trucking of the aggregates. It also allows for the efficient use of <br /> concrete trucks whereby a few trucks can haul the concrete to the job site <br /> that would otherwise require a great many trucks hauling longer distances <br /> thereby eliminating the truck traffic and conserving fuel. <br /> The plant will be set up in existing quarry floor and no farm land will be used. <br /> This plant can be moved in a very short time and we anticipate requesting <br /> Conditional Use permits for some of our other strategically located quarries <br /> as work and jobs develop. <br /> Sincerely, <br /> Yahara Materials, Inc. <br /> BY - <br /> --(--___------ <br /> Larry Bit Ca3ow, President <br /> LB:lb <br />
The URL can be used to link to this page
Your browser does not support the video tag.