|
Help
|
About
|
Sign Out
Home
Browse
Search
DCPREZ-0000-05750
DaneCounty-Planning
>
Zoning
>
1 Rezones
>
0000 YR
>
DCPREZ-0000-05750
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2016 3:35:18 PM
Creation date
4/1/2016 3:31:57 PM
Metadata
Fields
Template:
Rezone/CUP
Rezone/CUP - Type
Rezone
Petition Number
05750
Town
Blooming Grove Township
Section Numbers
1
AccelaLink
DCPREZ-0000-05750
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> Coastal March 23, 1993 <br /> E eav Pero e <br /> Mr. John Ziegler <br /> W1449 Alpine Road <br /> Brooklyn, Wisconsin 53520 <br /> Dear Mr. Ziegler: <br /> Re: Clay Excavation <br /> Tracts 201-09-M30 & 363-09-14 <br /> Section 1, T7N, R1OE <br /> Dane County, Wisconsin <br /> M.P. 62.8 16" Madison Loop <br /> M.P. 5.3 6" & 10" Columbus Laterals <br /> Reference is made to your letter of March 18, 1993, regarding clay extraction on the <br /> captioned property (Normal Ziegler Estate). You advised the clay extraction will be <br /> approximately five to six feet deep, with the land being refilled and returned to its present <br /> use. <br /> Our 16" Madison Loop pipelines and 6" and 10" Columbus pipelines cross the <br /> property. ANR Pipeline Company holds a 75 ft. wide easement for the 16" pipeline which°W <br /> extends 25 ft. westerly and 50 ft. easterly of the centerline of the pipeline. Our Company <br /> holds a 112.5 ft. wide easement for the 6" and 10" Columbus pipelines across the <br /> property, extending 37.5 ft. easterly of the 6" pipeline and 50 ft. westerly of the 10" <br /> pipeline. <br /> We request that no clay excavation be undertaken within our easement limits. In <br /> addition, no heavy equipment shall cross our pipelines except in areas designated or <br /> approved by our Company representative. Ramps, mats or padding required to protect our <br /> pipelines during crossings of heavy equipment shall be provided by the equipment operator. <br /> For the staking of the exact location of our pipelines and respective easement limits, <br /> please contact: <br /> Mr. M. 0. Maxson -or- Mr. E. Schneider <br /> Area Manager Superintendent <br /> P. 0. Box 149 P. 0. Box 478 <br /> Waukesha, WI 53187 Burlington, WI 53105 <br /> (414) 547-5528 (414) 763-6876 <br /> ANR Pipeline Company <br /> A SUBSIDIARY OF THE COASTAL CORPORATION <br /> 500 RENAISSANCE CENTER•DETROIT MI 48243.313/496-0200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.